![Case IH BC12000ER Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/case-ih/bc12000er/bc12000er_operation-manual_2567502019.webp)
19
operation
Operation
UNIT GROUNDING
Starting the Generator
FIllING OIl
Shift the machine outdoors, use wire of no less than 2.5mm to make the
machine and grounding terminal connected to the ground. One end of
the wire is pressed below the butterfly nut of the unit, screwed up tightly,
and the other end is connected with the metal rod shape article (such as
the iron nail and the opener), and inserted into soil.
Remove the oil filler cap fill oil of proper model As to dosage refer to
Page 18 Use the funnel for filling in case of careless spilling clean the
ground to avoid slipping.
Содержание BC12000ER
Страница 1: ...operation manual BC12000ER...
Страница 33: ...33 diagrams Electrical Schematic Diagram electrical schematic diagram 1 50hz 230v...
Страница 34: ...34 electrical schematic diagram 2 60hz 120v 240V diagrams...
Страница 35: ...35...
Страница 36: ...If you need assistance with the assembly or operation of your Generator please call 1 855 850 6668...