7
6892487-R3
CL1211.eps
CL1201.eps
CL1213.eps
CL1212.eps
CL0035.eps
12 in. (30 cm)
3–4°
LOAD HANDLING – DRUM CLAMPS
A) Align drums squarely
before clamping, all
drums same size.
B) Use correct
clamping force.
Position contact
pads under
upper chines.
Tilt back for transport
FORWARD DRUM DUMPER
CL7031.eps
Watch clearances
while dumping.
CL7032.eps
Содержание Bulk Box Handler Series
Страница 21: ...BLANK...