background image

5

6801202

ICKING UP, DUMPING LOADS

P

BD0149.eps

1

2

3

4

Verify bin fits attachment

HEIGHT

A)  Level forks, drive forward, bin 

against upper bin stops

A)  Tilt back for transport

A)  Level bin, raise for 

dump clearance

B)  Raise bin clear 

of ground

B)  Move control 

lever forward 

to dump load

WIDTH

LENGTH

Adjust stops.

Height: Allow up to 1.5 in. 

(38 mm) clearance with 

top of bin.

Length: Allow maximum 

.25" (6 mm) clearance 

from front bin stops.

BD0150.eps

BD0151.eps

4 in.

(10 cm)

BD0152.eps

3-4°

Watch Clearance

B)  Move control 

level forward 

1 second to 

engage front  

bin stops

A

Содержание 10A Bin

Страница 1: ...cascade corporation Cascade is a Registered Trademark of Cascade Corporation SER MANUAL U Manual Number 6801202 10A Bin Dumper ...

Страница 2: ...on 4 Bin Dumper Operation Auxiliary Valve Functions 4 Picking Up Dumping Loads 5 Safe Operation and Maintenance 6 OSHA Regulations 6 INSTALLATION Recommended Hydraulic Supply 7 Truck Requirements 8 Attachment Installation 9 PERIODIC MAINTENANCE 100 Hour Maintenance 12 500 Hour Maintenance 12 1000 Hour Maintenance 12 2000 Hour Maintenance 13 ...

Страница 3: ...k attachment combination is a responsibility of the original truck manufacturer and may be less than shown on the attachment nameplate Consult the truck nameplate WARNING Do not operate this attachment unless you are a trained and authorized lift truck driver This section contains operating instructions for the Cascade 10A Bin Dumper It will help you avoid common errors which often cause damage to...

Страница 4: ...turning on ramp Watch clearances Motor off park lower load Traveling empty No reaching through mast No standing under load Tilt Raise Observe Wet floors Workers Stops Bumps Dips Sound horn slow at intersection Sound horn slow at corner Slow for two way traffic With load No load P P P 3 in 8 cm RAMPS TRAFFIC STOP ...

Страница 5: ...s No Stand Zone 12 ft 4 m dia Limit truck movement with raised bin Load weight must not exceed combined truck attachment capacity see truck nameplate Center bin prior to lifting traveling or dumping No loads on top of bin Adjust stops to top of bin BD0167 eps ...

Страница 6: ...ns Check items each day Report problems to your supervisor See service manual for maintenance and repair procedures BD0148 eps Hydraulic Leaks A Dumper Forward B Dumper Back Fasteners Forks Bin Stops Safety Decals Fork Pin Engagement BD0164 eps A B Hoist Down Tilt Forward Hoist Up Tilt Back A B ...

Страница 7: ...vel bin raise for dump clearance B Raise bin clear of ground B Move control lever forward to dump load WIDTH LENGTH Adjust stops Height Allow up to 1 5 in 38 mm clearance with top of bin Length Allow maximum 25 6 mm clearance from front bin stops BD0150 eps BD0151 eps 4 in 10 cm BD0152 eps 3 4 Watch Clearance B Move control level forward 1 second to engage front bin stops A ...

Страница 8: ...s view the load engaging means shall be fully lowered controls neutralized and the brakes set to prevent movement 6 A safe distance shall be maintained from the edge of ramps or platforms while on any elevated dock or platform or freight car Trucks shall not be used for opening or closing freight doors 10 A load backrest extension shall be used whenever necessary to minimize the possibility of the...

Страница 9: ...se Cable Reel Selection Guide Part No 212199 to select the correct hose reel for the mast and truck Hose and fitting requirements are as follows Hoses and fittings for dump function should be at least No 6 with 9 32 in 7 mm minimum ID C B A A RH THINLINETM 2 Port Hose Reel Group OR B LH THINLINETM 2 Port Hose Reel Group OR C Single Internal Hose Reeving Group GA0033 eps ...

Страница 10: ...troleum base hydraulic fluid meeting Mil Spec MIL 0 5606 or MIL 0 2104B Use of synthetic or aqueous base hydraulic fluid is not recommended If fire resistant hydraulic fluid is required special seals must be used Contact Cascade Flow less than recommended will result in slower than normal dumping speed Flow greater than maximum can result in excessive heating reduced system performance and short h...

Страница 11: ...epare Hoses A Determine hose lengths required for hydraulic supply B Cut hoses to length install end fittings or quick disconnect kits BD0154 eps BD0155 eps BD0156 eps Extend Extend Retract Retract Quick Disconnect Fittings Quick Disconnect Fittings Hose Terminal Bin Dumper Valve Single Internal Hose Reeving RH shown Hose Reel RH shown ...

Страница 12: ... with union fittings B Operate auxiliary valves for 30 seconds C Remove union fittings GA0092 eps 4 Mount bin dumper A Position forks behind bin dumper B Drive forward inserting forks into rear fork pockets C Install fork pins behind fork heel BD0157 eps BD0158 eps C Top View Install fork pins A B ...

Страница 13: ...ty bin cycle dumper forward and back several times Check for operation in accordance with ITA ISO standards Check for leaks at fittings valve and cylinders BD0159 eps BD0160 eps GA0010 eps A Dumper Forward B Dumper Back BD0164 eps A B Hoist Down Tilt Forward Hoist Up Tilt Back A B Single Internal Hose Reeving RH shown Hose Reel RH shown ...

Страница 14: ... capscrews to 8 9 5 ft lbs 11 13 Nm Verify that the tilt frame rotates to 135 If necessary adjust locknut located underneath the attachment 1000 Hour Maintenance After each 1000 hours of truck operation in addition to the 100 and 500 hour maintenance perform the following procedures Inspect lower frame and lift cylinder bearings for wear Replace as necessary If the bearing is worn to less than 3 3...

Страница 15: ...inspection shall be carried out by trained personnel to detect any damage that might impair safe use Any fork that is defective shall be removed from service Reference ANSI B56 1 2005 Inspect for the following defects Surface cracks Straightness of blade and shank Fork angle Difference in height of fork tips Positioning lock Wear on fork blade and shank Wear on fork hooks Legibility of marking NOT...

Страница 16: ...Africa Tel 27 11 975 9240 Fax 27 11 394 1147 ASIA PACIFIC Cascade Japan Ltd 2 23 2 Chome Kukuchi Nishimachi Amagasaki Hyogo Japan 661 0978 Tel 81 6 6420 9771 Fax 81 6 6420 9777 Cascade Korea 121B 9L Namdong Ind Complex 691 8 Gojan Dong Namdong Ku Inchon Korea Tel 82 32 821 2051 Fax 82 32 821 2055 Cascade Xiamen No 668 Yangguang Rd Xinyang Industrial Zone Haicang Xiamen City Fujian Province P R Chi...

Отзывы: