4
Construction ( foundation )
Dig down the ground
Sand + pebble spread ( about 150 ~ 200mm )
Steel fiber (
Φ
16mm ) +
Φ
6mm steel mesh
– for the strength.
Concrete strength( 8kg / cm
2
).
Angle ( steel angle ) - ramp.
– Come in & out going
Lamp slope.
– Small angle - large space.
– large angle - load cell damage.
Содержание LDT
Страница 1: ...1 LDT Low Deck truck scale 로고 입력 제품 사진 삽입 제품 사진 삽입 ...
Страница 5: ...5 1 Foundation ...
Страница 7: ...7 2 Level adjust ...
Страница 8: ...8 2 Level adjust height horizontal ...
Страница 9: ...9 2 Level adjust load cell set ...
Страница 11: ...11 3 Main frame assembly ...
Страница 12: ...12 4 Main block assembly 1 ...
Страница 13: ...13 5 Main block assembly 2 ...
Страница 15: ...15 6 Summing box cover ...
Страница 16: ...16 4 corner adjust truck Load cell sensitivity trim VR Calibration Rs 232 serial check Environment Clean ...
Страница 17: ...17 6 4 corner adjust truck ...
Страница 18: ...18 6 Complete LDT scale ...
Страница 19: ...19 THANK YOU 감사합니다 E mail cas caskorea co kr www caskorea co kr TEL 82 2 461 0181 ...