VFD  INSTALLATION

 

 

VFD CONTROLLER :   

                                                                  

 

Generally  Electrical  installation  is  done  before 
installing  the  Fan.  Number  of  wires  to  be  used  will 
depend on whether the VFD is single or three phase. 
Wire Size should adhere to the Local electrical codes. 
However, connection between VFD & Fan will need 4 
wires.  Whether  the Input  to  VFD  is Single  phase or 
three  phase  ,power  to  the  fan  will  always  be  three 
phase. 

                                                                                                                                              
FIG-5                                             

 

 

Rated motor power:   

1.5 Kw & 1.1 Kw 

Input voltage    

3AC, 380…480V  -20%/+10%,47...63Hz 

Rated current:     

5.6 A 

Output voltage    

3 Phase DC link Volts 

Rated output current:  

4 A & 2.49A 

Output frequency   

0 Hz ...400 Hz 

Enclosure:    

IP20 

Ambient temperature  

0°C ... +40°C (S1) 

Approximate weight   

2 kg 

Specifications: 

 
 
 
 
 
 

 

four parameter sets, selectable on-line 

 

Sensor less vector control 

 

Automatic motor identification 

 

5 Digital inputs, 2 Analog inputs 

 

2 Relay outputs, 1 Analog output 

 

Integrated brake chopper and dynamic 
brake control 

 

RS232 and RS485 compatibility  via 

           RJ12 connector 
 
 
 
 

 
 

6.1 

1.5 

415 

3.35 

63 

1500 mm. 

600 mm 

7.3 

1.5 

415 

3.35 

56 

1500 mm. 

600 mm 

Содержание LVLS

Страница 1: ...NSTALLATION MAINTENANCE MANUALLVLS FAN CARYAIRE EQUIPMENTS INDIA PVT LTD Head office B 34 sector 85 Noida UP 201305 India Works I 61 Site v Surajpur Industrial Area Kasna Greater Noida UP 201306 India...

Страница 2: ...LVLS FAN Page 2 of 21 FIG 1...

Страница 3: ...k List 4 Technical details 5 VFD Controller Installation 6 Different Mounting Arrangements 7 Retaining Safety Cable Installation 8 Guy Guide Wire Installation 9 Motor Wiring Rotation Check 10 Blade Fi...

Страница 4: ...yms Banquet Halls Retail Stores and Worship Centers and all areas where air ventilation and air circulation require This appliance is not intended for use by persons including children with reduced ph...

Страница 5: ...for any damage or loss during transit 5 Has the Installation site been decided Installation site Clearances 6 Ensure that fan blades are a minimum 10ft or more from floor level 7 Ensure that any obst...

Страница 6: ...arances from the Fan are to be observed strictly FIG 2 FIG 3 FIG 4 TABLE 1 FAN DIAMETER Mt MOTOR KW MOTOR VOLTAGE V MOTOR CURRENT AMPS MOTOR OUTPUT RPM MINIMUM CLEARANCE FROM CEILING mm MINIMUM HORIZO...

Страница 7: ...IG 5 Rated motor power 1 5 Kw 1 1 Kw Input voltage 3AC 380 480V 20 10 47 63Hz Rated current 5 6 A Output voltage 3 Phase DC link Volts Rated output current 4 A 2 49A Output frequency 0 Hz 400 Hz Enclo...

Страница 8: ...LVLS FAN Page 8 of 21 Different mountig Applications Mounting applications shown below are representative only CONCRETE BEAM MOUNT FIG 6 I BEAM MOUNTING FIG 7...

Страница 9: ...LVLS FAN Page 9 of 21 OWSJ MOUNTING FIG 8 PURLIN MOUNTING FIG 9...

Страница 10: ...0mm Safety Cables Nuts Bolts FIG 11 Installing the Standard Mount Insert the I Beam or the OWSJ Beam between the I Beam Clamps Insert spacers if needed Insert Nuts Bolts and tighten properly Place the...

Страница 11: ...tom length extension can be provided if a non standard drop length is desired We can use a maximum of two extensions per assembly Installing an Extension fig 16 Fasten top plate of extension to bottom...

Страница 12: ...ded Position the safety cables as per the figure and fasten safety cable loops using two U Clamps on each safety cable loop Verify fan level by checking both directions on the fan frame vertical post...

Страница 13: ...LVLS FAN Page 13 of 21 Thimbles Eye Bolts Nuts washers Bolts FIG 20...

Страница 14: ...LVLS FAN Page 14 of 21 LVLS FAN MOUNTING WITH EXTENSION FRAME FIG 20A...

Страница 15: ...ment is more than 4mt extra hardware is required Secure one end with thimble and 2 cable clamps FIG 22 Repeat the process for the other 3 Guy Ropes Guy ropes should be about 90 degree apart FIG 19 Che...

Страница 16: ...EP 8 Blade Assembly Blade kit includes the following Items Blades Blade Toppers Nuts Bolts washers FIG 24 STEP 9 Safety Ring Safety Ring kit includes the following items Safety ring 5 Pieces Bolts was...

Страница 17: ...oller while the power supply is on unless required for the job to be performed A safety zone of 6mt radius should be created while doing maintenance on the fan safety wire and guy wires Personal safet...

Страница 18: ...Mt 6 1Mt 7 3Mt 3 1 liters Recommended Lubricant Synthatic oil Blades The blades are designed for maximum efficiency and quiet operation allowing minimum air disruption directly below the fan The airfo...

Страница 19: ...evices removed during maintenance should be re installed before applying power to the fan Do s and Don ts Check visually abnormal noise and vibration Disconnect all power at source before attempting I...

Страница 20: ...9818682723 dgupta caryaire com Mr Dipankar Joshi Asst Manager Sales 9818660518 djoshi caryaire com Mr Surendra Pal Singh India Head Services 9818379932 spsingh caryaire com Mr Arvind Kumar Service En...

Страница 21: ...RE EQUIPMENTS I PVT LTD PACKING LIST OF LVLS FAN 8FT 10FT 12FT 16ft 20ft 24Ft SL NO ITEM DETAILS QTY 1 Motor with Hub Assembly 1 no 2 Standard Extension Frame 1 no 3 Mounting Plate 1 no 4 VFD Panel 1...

Отзывы: