Electrical
Requirements
Operating
Instructions
Installation
Operates on 120 volt, 60 Hz, 1 PH, 2100 watts, 18 amps, 6 foot power cord
with NEMA 5-20P plug.
The CD27 has been designed for warming and holding 9” diameter bowls.
1. Remove the cabinet from its shipping carton, making sure that all pack-
ing materials are removed from the cabinet.
2. Check to ensure that all separate components are present and removed
from the packaging:
-Equipment Manual
3. Read the equipment manual completely before installing and operating
the cabinet.
6. Clean cabinet thoroughly before use (see instructions on page 1).
5. Connect the cabinet power cord to a correctly wired and protected power
source.
1. Plug the cabinet in and allow 45 minutes for preheat.
2. For best results, load bowls into the cart as quickly as possible. Door/lid
should be opened only when necessary. This will keep the bowls at the
proper temperature.
3. Take care to avoid bumping cart into doors, walls, obstructions, etc.
NOTES:
Loading cooled bowls into a warm cabinet will extend the heating time.
Loading cooled bowls into a cold cabinet will extend the heating time to
as much as two hours.
Do not plug into ungrounded receptacle. Check to ensure that
heater plug is in safe operating condition.
WARNING