
44
RTU Open Control System
For details on operating units equipped with the factory-installed
RTU Open controller, refer to the
“Factory-Installed RTU Open
Multi-Protocol Controller Control, Start-Up, Operation and Trou-
bleshooting”
manual.
Controller Options
LOW AMBIENT
If the unit comes with Electro-Mechanical (EM) control, then no
adjustment is necessary.
If the unit comes with the RTU Open control option, then refer to
its installation control manual for details on adjusting “Cooling
Lock-Out” setting and configure for the specific job requirements.
Step 12 — Adjust Factory-Installed Options
SMOKE DETECTORS
Smoke detector(s) will be connected at the Controls Connections
Board, at terminals marked “Smoke Shutdown.” Cut jumper
JMP 3 when ready to energize unit.
ECONOMI$ER IV OCCUPANCY SWITCH
See Fig. 58 for general EconoMi$er IV wiring. External occupan-
cy control is managed through a connection on the Controls Con-
nections Board.
If external occupancy control is desired, connect a time clock or
remotely controlled switch (closed for Occupied, open for Unoc-
cupied sequence) at terminals marked OCCUPANCY. Cut jumper
JMP 2 to complete the installation.
Step 13 — Install Accessories
Available accessories include:
• Roof curb
• Thru-base connection kit (must be installed before unit is
set on curb)
• Electric heaters and single-point connection kits
• Manual outside air damper
• Two-position motorized outside air damper
• EconoMi$er
®
IV (with control)
• EconoMi$er2 (without control/for external signal)
• Power Exhaust
• Differential dry-bulb sensor (EconoMi$er IV)
• Outdoor enthalpy sensor
• Differential enthalpy sensor
• CO
2
sensor
• Smoke Detector (Return Air and/or Supply Air)
• Louvered hail guard
• Motormaster
®
head pressure controls
• Phase monitor control
Refer to separate installation instructions for information on in-
stalling these accessories.
Fig. 58 — EconoMi$er IV Wiring
Содержание WeatherMaster 50HCQ 04 Series
Страница 4: ...4 Fig 2 50HCQ 04 06 Units Built On and After 4 15 2019 ...
Страница 5: ...5 Fig 3 50HCQ 04 06 Units Built Prior to 4 15 2019 ...
Страница 6: ...6 Fig 4 50HCQ 04 06 Corner Weights and Clearances ...
Страница 7: ...7 Fig 5 50HCQ 04 06 Base Rail Details ...
Страница 8: ...8 Fig 6 50HCQ 04 06 Thru the Base Charts ...
Страница 23: ...23 Fig 41 Electro Mechanical Control Wiring 208 230v 460v ...
Страница 24: ...24 Fig 42 Electro Mechanical Control Wiring 575v ...
Страница 25: ...25 Fig 43 Electro Mechanical Power Wiring 208 230 1 60 ...
Страница 26: ...26 Fig 44 Electro Mechanical Power Wiring 208 230 3 60 ...
Страница 27: ...27 Fig 45 Electro Mechanical Power Wiring 460 3 60 ...
Страница 28: ...28 Fig 46 Electro Mechanical Power Wiring 575 3 60 ...
Страница 29: ...29 Fig 47 PremierLink Wiring Schematic 208 230 460v ...
Страница 30: ...30 Fig 48 PremierLink Wiring Schematic 575v ...
Страница 31: ...31 Fig 49 RTU Open System Control Wiring ...