57
Fig. 82 — EconoMi$er IV Wiring
Step 13 — Adjust Factory-Installed Options
SMOKE DETECTORS — Smoke detector(s) will be con-
nected at the Controls Connections Board, at terminals marked
“Smoke Shutdown”. Cut jumper JMP 3 when ready to ener-
gize unit.
ECONOMI$ER IV OCCUPANCY SWITCH — Refer
to
Fig. 82 for general EconoMi$er IV wiring. External occupancy
control is managed through a connection on the Controls Con-
nections Board.
If external occupancy control is desired, connect a time
clock or remotely controlled switch (closed for Occupied, open
for Unoccupied sequence) at terminals marked OCCUPANCY.
Cut jumper JMP 2 to complete the installation.
Step 14 — Install Accessories
Available accessories include:
• Curb
• Thru-base connection kit (must be installed before unit is
set on curb)
• LP conversion kit
• Flue discharge deflector
• Manual outside air damper
• Two-Position motorized outside air damper
• EconoMi$er IV (with control)
• EconoMi$er2 (without control/for external signal)
• Power Exhaust
• Differential dry-bulb sensor (EconoMi$er IV)
• Outdoor enthalpy sensor
• Differential enthalpy sensor
• CO
2
sensor
• DDC interface (PremierLink)
• Louvered hail guard
• Motormaster
®
head pressure controls
• Phase monitor control
Refer to separate installation instructions for information on
installing these accessories.
Step 15 — Check Belt Tension —
Measure the belt
span length as shown in Fig. 83. Calculate the required deflec-
tion by multiplying the belt span length by
1
/
64
. For example, if
the belt span length is 32 inches: 32 x
1
/
64
=
1
/
2
inch deflection.
BELT FORCE — DEFLECTION METHOD — Check the
belt tension with a spring-force belt force deflection gauge
(available from drive belt manufacturer).
1. Place a straightedge along the belt between the two
pulleys. Measure the distance between the motor shaft
and the blower shaft.
2. Set the tension gauge to the desired tension (see Table 1
in Fig. 83). Place the large O-ring at that point.
Содержание WeatherMaker 48TC 04
Страница 4: ...4 Fig 2 Unit Dimensional Drawing ...
Страница 5: ...5 Fig 2 Unit Dimensional Drawing cont ...
Страница 21: ...21 Fig 34 48TC B07 Unit with Humidi MiZer Adaptive Dehumidification System Humidistat Wiring ...
Страница 39: ...39 Fig 45 PremierLink Wiring Schematic ...
Страница 40: ...40 Fig 46 PremierLink Wiring Schematic with Humidi MiZer System ...
Страница 48: ...48 Fig 65 Typical RTU Open System Control Wiring Diagram ...
Страница 49: ...49 Fig 66 Typical RTU Open System Control Wiring Diagram with Humidi MiZer System ...