![Carrier WeatherMaker 48A020 Скачать руководство пользователя страница 24](http://html.mh-extra.com/html/carrier/weathermaker-48a020/weathermaker-48a020_installation-instructions-manual_2560233024.webp)
24
OPTIONAL STAGED GAS UNITS
See Table 7 for staged gas information. Staging pattern is selected
during controls start-up. For complete information and service in
-
structions for staged gas control units, see Controls, Start-Up, Op
-
eration, Service and Troubleshooting literature.
Table 7 —
48A Series Staged Gas Control
Step 8 — Install Supply-Air Thermistors (Staged
and Modulating Gas Units Only)
Supply-air thermistors (SATs) are a field-installed, factory-provid
-
ed component. Three supply-air thermistors are shipped with
staged and modulating gas units inside the unit control box.
Thermistor wires must be connected to the SGC (staged gas con
-
troller) in the unit control box. See Table 8.
The supply-air thermistors should be located in the supply duct
with the following criteria:
• downstream of the heat exchanger cells
• equally spaced as far as possible from heat exchanger cells
• a duct location where none of the supply air thermistors
are within sight of the heat exchanger cells
• a duct location with good mixed supply air portion of the unit.
Table 8 —
SGC Thermistor Designations
SGC
— Staged Gas Controller
Step 9 — Make Electrical Connections
POWER WIRING
Units are factory wired for the voltage shown on unit nameplate.
Provide a unit safety disconnect switch in the main power supply
to each unit. See Fig. 23. Select switch size and mounting location
in accordance with applicable local codes or National Electrical
Code (NEC). If combining the functions of safety disconnect with
maximum overcurrent protection (MOCP) fuses (“fused discon
-
nect”), coordinate safety switch size with MOCP size data as
marked on unit informative plate.
Unit may be equipped with optional factory-installed non-fused
disconnect switch. See Fig. 23. Provide maximum overcurrent
protection devices (fuses or HACR breakers, per local codes) in
branch circuit wiring remote from unit. Observe requirements of
NEC Article 440. Install service switch upstream of remote fuses
if required.
The main power terminal block is suitable for use with aluminum
or copper wire. See Fig. 23. Units have circuit breakers for
compressors, fan motors, and control circuit. The unit must be
electrically grounded in accordance with local codes or, in absence
of local codes, with NEC, ANSI C1-latest year.
Fig. 23 —
Field Power Wiring Connections
FIELD POWER SUPPLY
Unit is factory wired for voltage shown on unit nameplate.
Field wiring can be brought into the unit from bottom (through
basepan and roof curb) or through side of unit (corner post next to
control box).
A 3
1
/
2
-in. NPT coupling for field power wiring and a
3
/
4
-in. NPT
coupling for 24-v control wiring are provided in basepan. In the
side post, there are two 2
1
/
2
-in. (sizes 020-035) or 3-in. (sizes 040-
060) knockouts for the field power wiring. See Fig. 5-12. If con
-
trol wiring is to be brought in through side of unit, a
7
/
8
-in. diame
-
ter hole is provided in the condenser side post next to control box.
NUMBER OF
STAGES
MODEL NUMBER POSITION
HEAT SIZE
5
6,7,8
5 STAGES
S
020
025
027
030
035
040
050
Low
T
035
040
050
High
7 STAGES
T
020
025
027
030
High
9 STAGES
T
060
High
11 STAGES
S
060
Low
WARNING
SGC sensors are located in the heat section for shipping and
must be field installed for proper stage gas heat operation.
Failure to do so may cause improper operation leading to
future relocation of the sensors and possible system compo
-
nent failure.
THERMISTOR
PIN
CONNECT
POINT
FUNCTION AND
LOCATION
PART NO.
Thermistors
SAT1
J8 – 1,2
(SGC)
SAT — Inserted into sup
-
ply section underneath the
gas heat section (factory-
provided, field-installed)
HH79NZ034
SAT2
J8 – 3,4
(SGC)
SAT — Inserted into sup
-
ply section underneath the
gas heat section (factory-
provided, field-installed)
SAT3
J8 – 5,6
(SGC)
SAT — Inserted into sup
-
ply section underneath the
gas heat section (factory-
provided, field-installed)
LIMTTEMP
J8 – 15,16
(SGC)
Limit Switch Thermistor
(LIMTTEMP) — Inserted
next to the lower limit
switch (factory-installed)
LEGEND
GND
—
Ground
NEC
—
National Electrical Code
TB
—
Terminal Block
FIELD SUPPLIED
DISCONNECT
PER NEC
FIELD
POWER
SUPPLY
11
21
22
23
13
12
TB1
EQUIP GND
FIELD POWER WIRING
11
21
22
23
13
12
GND
OPTIONAL
FACTORY-INSTALLED
DISCONNECT
FIELD-INSTALLED DISCONNECT
FACTORY-INSTALLED DISCONNECT
Содержание WeatherMaker 48A020
Страница 8: ...8 Fig 5 Base Unit Dimensions 48A2 A3 A6 A7020 035 7 DIMENSIONS ARE IN INCHES MM ...
Страница 10: ...10 Fig 7 Base Unit Dimensions 48A4 A5 A8 A9020 035 6 DIMENSIONS ARE IN INCHES MM ...
Страница 38: ......
Страница 39: ......