background image

PG80MSU: Installation, Start-up, Operating and Service and Maintenance Instructions

Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.

14

Field-supplied wiring shall conform with the limitations of 63°F (35°C)

rise
) rise.

115-V Wiring

Verify that the voltage, frequency, and phase correspond to that specified

on  unit  rating  plate. Also,  check  to  be  sure  that  service  provided  by

utility is sufficient to handle load imposed by this equipment. Refer to

rating plate or 

Table 6

 for equipment electrical specifications. 

Make  all  electrical  connections  in  accordance  with  current  edition  of

National  Electrical  Code  (NEC)  NFPA  70  and  any  local  codes  or

ordinances that might apply. 
Use a separate, fused branch electrical circuit with a properly sized fuse

or  circuit  breaker  for  this  furnace. See 

Table 6

  for  wire  size and fuse

specifications. A readily accessible means of electrical disconnect must

be located within sight of the furnace.

NOTE: 

Proper polarity must be maintained for 115-V wiring. If polarity

is  incorrect,  control  LED  status  indicator  light  will  flash  rapidly  and

Status code (

10.1

) is displayed. The furnace will NOT operate. 

A180241

Fig. 23 – Heating and Cooling Application Wiring Diagram with 

1-Stage Thermostat

Table 6 – Electrical Data

A190279

Fig. 24 – Field-Supplied External Electrical Box on Furnace Casing

J-Box Relocation

NOTE: 

If  factory  location  of  J-Box  is  acceptable,  go  to  next  section

(ELECTRICAL CONNECTION TO J-BOX). 

1. Remove and save two screws holding J-Box. 

NOTE: 

The J-Box cover need not be removed from the J-Box in order

to move the J-Box. Do NOT remove green ground screw inside J-Box. 

2. Cut wire tie on loop in furnace wires attached to J-box.
3. Move J-Box to desired location.
4. Fasten J-Box to casing with two screws removed in Step 1.
5. Route J-Box wires within furnace away from sharp edges, rotating

parts and hot surfaces. 

WARNING

!

ELECTRICAL SHOCK AND FIRE HAZARD

Failure to follow this warning could result in personal injury, death, or

property damage.

The  cabinet  MUST  have  an  uninterrupted  or  unbroken  ground

according  to  current  edition  of  NEC  NFPA  70  or  local  codes  to

minimize personal injury if an electrical fault should occur. This may

consist of electrical wire, conduit approved for electrical ground or a

listed,  grounded  power  cord  (where  permitted  by  local  code)  when

installed  in  accordance  with  existing  electrical  codes.  Refer  to  the

power cord manufacturer’s ratings for proper wire gauge. Do not use

gas piping as an electrical ground.

CAUTION

!

FURNACE MAY NOT OPERATE

Failure  to  follow  this  caution  may  result  in  intermittent  furnace

operation. 
Furnace control must be grounded for proper operation or else control

will lock out. Control must remain grounded through green/yellow wire

routed to gas valve and gas valve mounting bracket screw.

Unit Size

Volts-

Hertz- Phase

Operating Voltage

*

 Range

*. Permissible limits of the voltage range at which the unit operates satisfactorily.

Maximum 

Unit Amps

Unit

Ampacity

†. Unit ampacity = 125 percent of largest operating component’s full load amps plus 100 percent of all other potential operating components’ (EAC, humidifier, etc.) full load 

amps.

Minimum 

Wire Size 

AWG

Maximum 

Wire 

Length

 

Ft (M)

‡. Length shown is as measured one way along wire path between unit and service panel for maximum 2 percent voltage drop.

Maximum 

Fuse or CKT 

BKR

**

 Amps

**. Time-delay type is recommended.

Maximum

Minimum

36040B

115-60-1

127

104

8.6

11.2

14

33 (10.1)

15

48060B

115-60-1

127

104

11.0

14.2

14

26 (7.9)

15

60080C

115-60-1

127

104

14.2

18.2

12

31 (9.6)

20

60100C

115-60-1

127

104

14.2

18.2

12

31 (9.6)

20

WARNING

!

FIRE HAZARD

Failure to follow this warning could result in personal injury, death, or

property damage.

Do not connect aluminum wire between disconnect switch and furnace.

Use only copper wire. See 

Fig. 24

Содержание PG80MSU

Страница 1: ...NFORMATION GUIDE 40 MODEL NOMENCLATURE 40 To learn more about this appliance and installation via a mobile device go to https www payne com NFC or use the QR code below To access airflow tables or tro...

Страница 2: ...se carbon monoxide poisoning explosion fire electrical shock or other conditions which may cause personal injury or property damage Consult a qualified service agency local gas supplier or your distri...

Страница 3: ...ply ducts carry air circulated by the furnace to areas outside the space containing the furnace the return air shall also be handled by duct s sealed to the furnace casing and terminating outside the...

Страница 4: ...db Failure to follow these return air temperature limits may affect reliability of heat exchangers motors and controls see Fig 4 For accessory installation details refer to the applicable instruction...

Страница 5: ...city firmly touch a clean unpainted metal surface of the furnace again before touching control or wires 5 Use this procedure for installed and uninstalled ungrounded furnaces 6 Before removing a new c...

Страница 6: ...ut rating for all gas appliances installed in the space Spaces having less than 50 cubic feet per 1 000 BTUh require the OUTDOOR COMBUSTION AIR METHOD Spaces having at least 50 cubic feet per 1 000 BT...

Страница 7: ...ss volume than 50 cubic feet per 1 000 BTUh of the maximum input ratings for all gas appliances installed in the space and 2 The air infiltration rate is not known to be less than 0 40 air changes per...

Страница 8: ...ings with unusually tight construction additional air MUST be provided using the methods described in the Outdoor Combustion Air Method section Unusually tight construction is defined as construction...

Страница 9: ...own in Fig 13 NOTE It is required that the perforated supply air duct flanges be completely folded over or removed from furnace when installing the furnace on a factory supplied cased coil or coil box...

Страница 10: ...Protection Provide a minimum 17 3 4 in x 22 in 451 mm x 559 mm piece of sheet metal for flame roll out protection in front of burner area for furnaces closer than 12 inches 305 mm above the combustibl...

Страница 11: ...n a 1 in 25 mm clearance from combustible materials to supply air ductwork for a distance of 36 in 914 mm horizontally from the furnace See NFPA 90B or local code for further requirements Ductwork Aco...

Страница 12: ...GC Installations must be made in accordance with all authorities having jurisdiction If possible the gas supply line should be a separate line running directly from meter to furnace NOTE In the state...

Страница 13: ...and downstream of manual equipment shutoff valve A02035 Fig 22 Typical Gas Pipe Arrangement Piping should be pressure and leak tested in accordance with NFGC in the United States local and national pl...

Страница 14: ...in Step 1 5 Route J Box wires within furnace away from sharp edges rotating parts and hot surfaces WARNING ELECTRICAL SHOCK AND FIRE HAZARD Failure to follow this warning could result in personal inju...

Страница 15: ...ket BX Cable Installation in Furnace J Box 1 Remove cover from J Box 2 Route BX cable into 7 8 inch diameter hole in J Box 3 Secure BX cable to J Box bracket with connectors approved for the type of c...

Страница 16: ...sted or draft hood equipped appliances in accordance with the NFGC the local building codes and furnace and vent manufacturers instructions The following information and warning must be considered in...

Страница 17: ...in operation Seal any unused openings in venting system Inspect the venting system for proper size and horizontal pitch as required in the current edition of National Fuel Gas Code ANSI Z223 1 NFPA 5...

Страница 18: ...condensation and corrosion in the venting system Do not use vent dampers on appliances common vented with this furnace Additional Venting Requirements A 4 101 mm round vent elbow is supplied with the...

Страница 19: ...t connector is required refer to Note 1 above 3 Side outlet vent for upflow and downflow installations must use Type B vent immediately after exiting the furnace except when factory authorized Downflo...

Страница 20: ...0 935 875 815 750 690 620 570 520 470 6 1050 995 935 880 820 755 700 645 595 550 7 1130 1075 1020 970 915 855 800 745 690 645 8 1200 1150 1100 1050 1000 945 890 840 785 735 9 1285 1240 1190 1145 1095...

Страница 21: ...315 175 3 1035 935 830 745 640 550 460 365 235 140 4 1095 1000 900 815 725 630 545 455 360 240 5 1205 1125 1035 945 870 780 695 620 540 455 6 1290 1210 1125 1040 965 890 805 725 645 570 7 1385 1310 1...

Страница 22: ...ct Super Plug available from distributor replacement component for the control board to copy the correct model program onto the new board Further details and instructions for these programming methods...

Страница 23: ...Service and Maintenance Instructions Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations 23 A221015 Fig 34 3 Digit Display Flow Char...

Страница 24: ...to the gas valve if a flame rollout or overheating condition occurs in the gas control area DO NOT bypass the switches Correct inadequate combustion air supply problem before resetting the switches CA...

Страница 25: ...e unit rating plate For installation above 2 000 ft 610 M multiply the input on the rating plate by the derate multiplier in Table 14 for the correct input rate A180238 Fig 37 Orifice Hole WARNING FIR...

Страница 26: ...door switch f Set thermostat to call for heat g Remove regulator seal cap and turn regulator adjusting screw counterclockwise out to decrease input rate of clockwise in to increase input rate h Instal...

Страница 27: ...2 6 2 7 2 8 2 9 850 2 4 2 5 2 6 2 7 to 875 2 3 2 4 2 5 2 5 900 2 2 2 3 2 3 2 4 5000 925 2 1 2 1 2 2 2 3 1524 950 2 0 2 0 2 1 2 2 975 1 9 1 9 2 0 2 0 1000 1 8 1 8 1 9 1 9 U S A Only 725 3 2 3 3 3 4 3...

Страница 28: ...U S A Only 725 2 9 3 0 3 1 3 1 750 2 7 2 8 2 9 3 0 5001 775 2 5 2 6 2 7 2 8 1524 800 2 4 2 4 2 5 2 6 825 2 2 2 3 2 4 2 5 to 850 2 1 2 2 2 2 2 3 875 2 0 2 0 2 1 2 2 5400 900 1 9 1 9 2 0 2 1 1646 925 1...

Страница 29: ...failure If limit control does not function during this test cause must be determined and corrected a Run furnace for at least 5 minutes b Gradually block off return air with a piece of cardboard or sh...

Страница 30: ...es proceed with the following NOTE NO thermostat signal may be present at control and all blower OFF delays must be completed a Leave 115 V power to furnace turned on b Remove outer access door c Remo...

Страница 31: ...d dirt and grease from blower wheel and motor annually The inducer and blower motors are pre lubricated and require no additional lubrication These motors can be identified by the absence of oil ports...

Страница 32: ...eel wool 0000 grade Do not use sand paper or emery cloth To reinstall igniter and flame sensor 1 Install the Hot Surface Igniter HSI and bracket with igniter gasket into burner assembly 2 Install flam...

Страница 33: ...end of spring cable end opposite brush 2 Insert brush end of cable into the outlet opening of cell and slowly rotate with drill DO NOT force cable Gradually insert cable into upper pass of cell see Fi...

Страница 34: ...iod the control CPU will open the gas valve relay GVR de energizing the gas valve solenoid GV The control CPU will repeat the ignition sequence for up to three more Trials for Ignition before going to...

Страница 35: ...er motor BLWM operation 4 Heat pump When installed with a heat pump the furnace control automatically changes the timing sequence to avoid long blower off times during demand defrost cycles Whenever W...

Страница 36: ...lation Start up Operating and Service and Maintenance Instructions Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations 36 TROUBLESHO...

Страница 37: ...U Installation Start up Operating and Service and Maintenance Instructions Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations 37 A2...

Страница 38: ...Start up Operating and Service and Maintenance Instructions Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations 38 A221105 Fig 40 T...

Страница 39: ...re only furnace is running Firing rate heat content btu cu ft X size of the dial cu ft rev X of rev per 60 sec rev sec X 3600 sec hr Example 1050 btu cu ft X 0 5 cu f t rev X 2 revs 60sec X 3600 sec h...

Страница 40: ...ll Cell panel Inducer Group Housing assembly Transducer Inducer motor Inducer wheel TO OBTAIN INFORMATION ON PARTS Consult your installing dealer or a licensed Heating and Air Conditioning company of...

Отзывы: