12
8. After the cleaning replace the heat exchanger baffles, flue
collar plate and oil burner;
9. Readjust the burner for proper operation.
4.2 CLEANING
THE
BLOCKED
VENT
SHUT-OFF
DEVICE
(BVSO)
For continuous safe operation, the Blocked Vent Shut-off device
(BVSO) must be inspected and maintained annually by a
qualified service technician.
1. Disconnect power to the appliance;
2. Remove the two screws holding on the BVSO assembly
cover;
3. Remove the cover;
4. Remove the two screws holding the control box to the heat
transfer tube assembly. Sliding the control box in the
appropriate direction will unlock it from the heat transfer
tube assembly;
5. Carefully remove any build-up from the thermal switch
surface;
CAUTION
Do not dent or scratch the surface of the thermal switch. If the
thermal switch is damaged it MUST be replaced.
6. Clean and remove any build-up or obstruction inside the
heat transfer tube;
7. Re-mount, lock and fasten the control box with the 2 screws
removed in step 4;
8. Re-attach the assembly cover with the screws removed in
step 2;
9. Re-establish power to the unit.
4.3 CHANGING
OF
THE
BURNER
HEAD
Once annually, remove the retention head and electrodes from
the drawer assembly and remove all foreign matter, if
necessary. Also clean the extremity of the burner tube, if
necessary.
4.4 CHANGING
THE
NOZZLE
Change the nozzle once a year with the one specified in Table
6.
4.5 CHANGING
THE
OIL
FILTER
Tank Filter
The tank filter should be changed as required. Follow the
manufacturer’s instructions.
Secondary Filter
The 10 micron, or finer, filter cartridge should be changed
annually. Follow the manufacturer’s instructions.
4.6 CHANGING
THE
AIR
FILTER
Dirty filters have an impact on the efficiency of the furnace
and increase fuel consumption.
Air filters should be changed at least once a year. Very
dusty conditions, the presence of animal hair and the like
will require more frequent changing or cleaning.
Содержание OBM112 Series
Страница 17: ...17 Figure 9 Furnace Dimensions ...
Страница 18: ...18 Figure 10 Wiring Diagram 4 Speed Motor PSC ...
Страница 19: ...19 Figure 11 Wiring Diagram Variable Speed Motor ECM ...
Страница 20: ...Figure 12 Parts list with 4 speed motor PSC 20 B50091C ...
Страница 22: ...22 Figure 13 Parts list with variable speed motor ECM B50092C ...
Страница 24: ......
Страница 42: ...Figure 9 Dimensions de la fournaise 18 ...
Страница 43: ...19 Figure 10 Diagramme électrique avec moteur 4 vitesses PSC ...
Страница 44: ...20 Figure 11 Diagramme électrique avec moteur vitesse variable ECM ...
Страница 45: ...Figure 12 Liste de pièces avec moteur 4 vitesses PSC 21 B50091C 21 B50091C ...
Страница 47: ...23 B50092C 23 B50092C Figure 13 Liste de pièces avec moteur vitesse variable ECM B50092C ...