Container Refrigeration

ANNUAL INSPECTION

For

NaturaLINE 69NT40-601

Container Refrigeration Units

62-12119

Содержание NaturaLINE 69NT40-601

Страница 1: ...Container Refrigeration ANNUAL INSPECTION For NaturaLINE 69NT40 601 Container Refrigeration Units 62 12119...

Страница 2: ......

Страница 3: ...ANNUAL INSPECTION For NaturaLINE 69NT40 601 Container Refrigeration Units 2019 Carrier Corporation Printed in USA September 2019...

Страница 4: ......

Страница 5: ...1 62 12119 TABLE OF CONTENTS PURPOSE 1 TOOLS REQUIRED 2 WARNINGS AND NOTES 2 UNIT NAMEPLATE 3 REAR OF UNIT 4 FRONT OF UNIT 10 OPERATIONAL INSPECTION 19 APPENDIX 23...

Страница 6: ......

Страница 7: ...res annually to obtain maximum operating time from the equipment This manual is to be used in conjunction with the operations service manuals supplied with the equipment Reference is made throughout t...

Страница 8: ...ystem cannot be plugged in during the maintenance procedure 2 Carrier Transicold recommends wearing the appropriate safety equipment such as safety glasses gloves etc whenever working on refrigeration...

Страница 9: ...im Singapore 629146 Date of Manufacture Model Number Parts ID Number Serial Number Voltage Dry Wt Refrig Charge Phase Hertz Max Amp Draw Net Refrigeration Capacity Interior Temperature Ambient Tempera...

Страница 10: ...traighten any fin damage using the correct fin comb 8 fins per inch c Check for any signs of leaks or corrosion and repair replace as necessary NOTE For certain cargos exposed to fumigation it is reco...

Страница 11: ...fan blade as necessary Figure 2 Evaporator Motor and Fan Blade 5 Wire Harnesses a Examine for any worn or damaged wires and repair as required b Ensure wire harnesses are properly secured 6 Defrost Te...

Страница 12: ...frost drain lines using a low pressure water hose to flush debris contained in the drain Check that the water is running freely from the outside drain Refer to Figure 5 Figure 5 Outside Drain 8 Electr...

Страница 13: ...Electronic Expansion Valve EEV 9 Evaporator Temperature Sensor ETS Refer to Figure 7 a Ensure that the wire tie is in position and insulation is in place Figure 7 Evaporator Temperature Sensor ETS Wi...

Страница 14: ...the retain ing clips c Inspect wiring for correct connections and repair if required Refer to the TechLINE June 2014 issue for heater Megaohm testing Figure 8 Heaters 11 Heater Termination Thermostat...

Страница 15: ...or cap is missing repair or replace as needed Figure 10 USDA 13 Air Flow a Check channels or T bars on the floor and under the lower air baffle kick plate for cleanliness b Channels must be free of d...

Страница 16: ...ature Sensor CPDS 7 High Side Pressure Relief Valve HS PRV 8 High Pressure Switch HPS 9 Plug 10 Gas Cooler Temperature Sen sor GCTS 11 Flash Tank 12 Service Fitting Discharge 13 Discharge Pressure Tra...

Страница 17: ...Heavy Duty Scour Pad or similar c Wipe down with isopropyl alcohol to remove loose material and any grease d Paint using the following standard paint specifications pur chase locally 17 Access Panels...

Страница 18: ...amine the fan motor for signs of overheating or physical damage Repair or replace as necessary e Check the motor mounting bracket for cracking where welded to the frame See Figure 12 b Repair if neces...

Страница 19: ...d environment conditions d Check for signs of excessive corrosion to the fins and tube sheets Replace as necessary Figure 13 Gas Cooler Coil Cleaning 20 High Pressure Expansion Valve HPXV Refer to Fig...

Страница 20: ...t is pressed all the way down engaging with the O ring Figure 15 Economizer and Unloader Valve ESV USV 22 Pressure Relief Valves LS FT HS Refer to Figure 16 a Inspect the pressure relief valves for an...

Страница 21: ...lace as required Figure 17 Filter Drier 24 Water Cooled Condenser Optional Refer to Figure 18 a Inspect assembly for excessive corrosion or physical dam age Repair or replace as necessary b Check the...

Страница 22: ...f more than one repair splice is found d Examine the plug gasket for any cracking damage and replace if necessary See Figure 20 e Inspect the male pins Replace if evidence of arcing pitting or if the...

Страница 23: ...e from signs of damage over heating and corrosion Repair any damage to the control box door gasket if needed b Secure all loose wires with wire ties c Examine contacts for severe pitting and replace t...

Страница 24: ...or replace if damaged or missing Figure 22 Interrogation Sockets 28 Wiring a Examine loose wires and wire harnesses outside of the con trol box for routing neatness and condition Replace or repair as...

Страница 25: ...to always have the latest software installed b Check Cd20 to verify the model number This should match the last 5 digits of the model number on the nameplate i e for 69NT40 601 001 the display will sh...

Страница 26: ...r a DataCORDER Trip Start Refer to Figure 26 a By entering a trip start first all test data will be included as part of the maintenance record b Press the ALT MODE key When the left display shows dC p...

Страница 27: ...est and repair 42 Perform an Upper Vent Position Sensor calibration optional equipment a Rotate the vent to the 0 CMH CFM position Cd45 will auto matically display Code Title Default Options Cd27 Defr...

Страница 28: ...ownload interrogate the unit DataCORDER using a PCMCIA downloading card USB adapter or DataLINE It is recommended to get an ALL DATA download for records The minimum should be LAST TRIP START to ensur...

Страница 29: ...7 8 10 11 Service Fittings Suction Service Fitting 19 21 26 28 Discharge Service Fitting 7 8 10 11 Pressure Switch High Pressure Switch 13 14 18 19 Bolts Compressor Flange Bolts 26 28 36 38 Component...

Страница 30: ...106 36 96 8 62 599 18 0 4 680 735 38 100 4 57 657 16 3 2 665 363 40 104 0 53 200 14 6 8 649 992 42 107 6 49 117 12 10 4 620 224 44 111 2 45 367 10 14 0 563 722 46 114 8 41 965 8 17 6 507 219 48 118 4...

Страница 31: ...rovide download along with actions required for it to pass Active Alarms If Any Leak Inspection Use Tool Part Number 07 00529 00 Component Location Leak Comments Compressor 1st Stage Suction 1st Stage...

Страница 32: ...62 12119 26 Photos Location Comments Front of Unit Compressor Flash Tank Gas Cooler Oil Residue If Any Corrosion If Any General Comments...

Страница 33: ...ader Valve ESV USV 14 EEV Coil 6 Electrical Control Box 17 Electronic Expansion Valve EEV 6 Electronic Leak Detector 11 Evaporator Access Panels 11 Evaporator Coil 4 Evaporator Fan Blade 4 5 Evaporato...

Страница 34: ...P Parts Identification Number PID 3 Power Cables 16 Pressure Equipment Directive PED Compliance Label 3 Pressure Relief Valves LS FT HS 14 S Screwdrivers 2 Shroud 12 Solenoid Coil 14 Stator 5 T Tools...

Страница 35: ......

Страница 36: ...A part of UTC Building Industrial Systems a business unit of United Technologies Corporation Stock symbol UTX Carrier Transicold P O Box 4805 Syracuse NY 13221 USA www carrier transicold com...