41
INSTALL ACCESSORY ISOLATION (if required) —
Uneven floors or other considerations may dictate the use of
accessory soleplates (supplied by Carrier for field installation)
and leveling pads. Refer to Fig. 48.
Level machine by using jacking screws in isolation sole-
plates. Use a level at least 24-in. (610 mm) long.
For adequate and long lasting machine support, proper
grout selection and placement is essential. Carrier recommends
that only pre-mixed, epoxy type, non-shrinking grout be used
for machine installation. Follow manufacturer’s instructions in
applying grout.
1. Check machine location prints for required grout
thickness.
2. Carefully wax jacking screws for easy removal from
grout.
3. Grout must extend above the base of the soleplate and
there must be no voids in grout beneath the plates.
4. Allow grout to set and harden, per manufacturer’s
instructions, before starting machine.
5. Remove jacking screws from leveling pads after grout
has hardened.
.
OUTSIDE EDGE O
1'-3 7/8"
[403mm]
CONDENSER TUBE
OUTSIDE EDGE OF
(TYPICAL BOTH EN
COOLER TUBESH
(TYPICAL BOTH E
[997mm]
3'-3 1/4"
Y*
[387mm]
TYPICAL
1'-3 1/4"
14'-9"
[4496mm]
SUPPORT PLATE
X*
[4286mm]
14'-0 3/4"
[105mm]
X
TYPICAL
[13mm]
0'-0 1/2"
[213mm]
0'-8 3/8"
0'-4 1/8"
0'-9"
Y
TYPICAL
[229mm]
0'-3"
[76mm]
ACCESSORY SOLEPLATE
TYPICAL
0'-3 1/2"
[89mm]
[610mm]
2'-0"
[38mm]
0'-1 1/2"
TYPICAL
CL
COOLER & COMPRESSOR
REAR
FRONT
SUCTION END
DISCHARGE END
CL
CONDENSER
Fig. 45 — 23XRV Frame Size B Machine Footprint
a23-1684
IMPORTANT: Chiller support plates must be level
within
1
/
2
in. from one end to the other end of the heat
exchangers for effective oil reclaim system operation.
VIEW Y-Y
a23-46
NOTES:
1. Dimensions in ( ) are in millimeters.
2. Isolation package includes 4 shear flex pads.
Fig. 47 — Standard Isolation
/LEG
LEGEND
NOTES:
1. Dimensions in ( ) are in millimeters.
2. Accessory (Carrier supplied, field installed) soleplate pack-
age includes 4 soleplates, 16 jacking screws and leveling
pads.
3. Jacking screws to be removed after grout has set.
4. Thickness of grout will vary, depending on the amount nec-
essary to level chiller. Use only pre-mixed non-shrinking
grout,
Ceilcote 748 OR Chemrex Embeco 636 Plus Grout 0
-1½
(38.1) to 0
-2¼
(57) thick.
HRS — Hot Rolled Steel
VIEW X-X
ACCESSORY SOLEPLATE DETAIL
a19-1109
a19-1110
Fig. 48 — Accessory Isolation
Содержание EVERGREEN 23XRV
Страница 53: ...53 Fig 60 Typical Field Wiring Schematic LF 2 VFD Shown NOTE See Notes for Fig 60 on page 56 ...
Страница 54: ...54 Fig 60 Typical Field Wiring Schematic LF 2 VFD Shown cont a23 1585 ...
Страница 55: ...55 Fig 60 Typical Field Wiring Schematic LF 2 VFD Shown cont a23 1586 ...
Страница 60: ...60 Fig 63 23XRV Controls Schematic LF 2 ...
Страница 63: ...63 SEE NEXT PAGE SEE NEXT PAGE SEE NEXT PAGE Fig 67 23XRV Controls Schematic Rockwell Standard Tier VFD Shown ...
Страница 64: ...64 FROM PREVIOUS PAGE Fig 67 23XRV Controls Schematic Rockwell Standard Tier VFD Shown cont ...
Страница 73: ...73 Fig 78 Lead Lag Control Wiring Parallel Flow Application Unit with R Compressor Shown a23 1597 ...
Страница 74: ...74 Fig 79 Lead Lag Control Wiring Series Flow Application Unit with R Compressor Shown a23 1598 ...