![Carrier EDGE Pro Скачать руководство пользователя страница 3](http://html.mh-extra.com/html/carrier/edge-pro/edge-pro_installation-instructions-manual_2564080003.webp)
3
6. During thermostat installation provide sufficient excess
wiring behind the mounting plate. Coil the wiring creating
a service loop and place in mounting box or behind the
wall to remove strain against the terminal strip. See Fig. 4.
7. Secure rear plastic mounting base to wall with 2 screws
and anchors provided. Additional mounting holes are avail-
able for more secure mounting if needed. Make sure all
wires extend through hole in mounting base.
8. Adjust length and routing of each wire to reach proper con-
nector block and terminal on mounting base with extra
1
/
4
-in. wire.
9. Connect two wires from the equipment control module to
the display module mounting base, being careful not to
over-tighten the screws. Correct polarity must be observed
when connecting the two wires. If wires are connected in-
correctly, the display module will not operate. See Fig. 5
and 6.
a33-9162
Fig. 1 — Locking Tab Location
a33-9163
Fig. 2 — Mounting Plate Removed
a33-9164
Fig. 3 — Mounting Plate Installation
Fig. 4 — Coil Excess Wiring
a33-9165
Fig. 5 — Backplate Connector Terminals
Содержание EDGE Pro
Страница 27: ......