Table 6 – Single--Stage Sequence of Operations
Trial--for--Ignition Sequence: The ignition sequence is to immediately energize the inducer motor on a call for heat. Within approximately 5
sec of the call for heat, the gas valve will open and the igniter will spark. Seven sec will be allowed to prove flame sense on the far burner.
Flame--Proving: Once flame is proven, the control will wait an additional 45 sec to energize the indoor blower motor. On removal of the call
for heat, the gas valve will immediately shut down, the inducer motor will run for an additional 5 sec, and the indoor blower will run for an
additional 45 sec (minimum).
Table 7 – Single--Stage Rated Heating Input, Propane Gas (0--2000 ft (0--610 m) Altitude)
NAMEPLATE INPUT (BTU/HR)
RATED HEATING INPUT PROPANE (BTU/HR)
40,000
38,000
60,000
53,000
90,000
79,000
115,000
103,000
130,000
116,000
Pipe Plug
Manifold
A07872
Fig. 17 -- Single--Stage Burner Assembly
MANIFOLD
BURNER
BURNER FLAME
(Blue in appearance)
A07805
Fig. 18 -- Monoport Burner
CPL
P
CONV