14
Remove plug from
collector box.
DO NOT DISCARD.
If alternate vent position
is required, loosen clamp
on inlet of vent elbow.
Remove the screw that secures
the trap to the collector box and
remove trap.
Unconverted Factory Configuration
As Viewed in the Horizontal Right Orientation
Attach condensate
trap with screw to
collector box.
Slide relief tube in stand
ï
offs
to adjust length.
Vent elbow shown in alternate
orientation. Tighten clamp on
inlet to vent elbow 15 lb.
ï
in.
Align trap over middle and
right
ï
hand port on collector box.
NOTE: Remove knockout in
casing before re
ï
installing the
condensate trap.
Install plug on
open port of
collector box
Horizontal Right Trap Configuration
A11573
Fig. 10 -- Horizontal Right Trap Configuration
(Appearance may vary)
Содержание 59TP6B
Страница 41: ...41 A190044 Fig 39 Example of Variable Speed Furnace Control ...
Страница 72: ...72 A190070 Fig 64 Service Label Information ...
Страница 90: ...90 A190072 Fig 73 Wiring Diagram ...