CUT ALON
G
DOTT
E
D
LINE
CU
T ALONG DOTTED LINE
PRESSURES
Refrigerant Suction
CIRCUIT A _____________ PSIG
CIRCUIT B _____________ PSIG
Refrigerant Discharge
CIRCUIT A _____________ PSIG
CIRCUIT B _____________ PSIG
Verify Refrigerant Charge using Charging Charts (Y/N) _____
GENERAL
Economizer minimum vent and changeover settings to job re
q
uirements (if e
q
uipped) (Y/N) _____
Verify smoke detector unit shutdown by utilizing magnet test (Y/N) _____
IV. HUMIDI-MIZER
®
START-UP
STEPS
1. Check CTB for jumper 5, 6, 7 (Jumper 5, 6, 7 must be cut and open) (Y/N) _____
2. Open humidistat contacts (Y/N) _____
3. Start unit In cooling (Close Y1) (Y/N) _____
OBSERVE AND RECORD
A. Suction pressure
_______________ PSIG
B. Discharge pressure
_______________ PSIG
C. Entering air temperature
_______________ ° F
D. Li
q
uid line temperature at outlet or reheat coil
_______________ ° F
E. Confirm correct rotation for compressor (Y/N) _____
F. Check for correct ramp-up of outdoor fan motor as condenser coil warms (Y/N) _____
4. Check unit charge per charging chart (Y/N) _____
(Jumper 32L Motormaster
®
temperature sensor during this check. Remove jumper when complete.)
5. Switch unit to high-latent mode (sub-cooler) by closing humidistat with Y1 closed (Y/N) _____
OBSERVE
A. Reduction in suction pressure (5 to 7 psi expected) (Y/N) _____
B. Discharge pressure unchanged (Y/N) _____
C. Li
q
uid temperature drops to 50 to 55°F range (Y/N) _____
D. LSV solenoid energized (valve closes) (Y/N) _____
6. Switch unit to dehumid (reheat) by opening Y1 (Y/N) _____
OBSERVE
A. Suction pressure increases to normal cooling level
B. Discharge pressure decreases (35 to 50 psi) (Limited by Motormaster control)
C. Li
q
uid temperature returns to normal cooling level
D. LSV solenoid energized (valve closes)
E. DSV solenoid energized, valve opens
7. With unit in dehumid mode close W1 compressor and outdoor fan stop; LSV and DSV solenoids de-energized
(Y/N) _____
8. Open W1 restore unit to dehumid mode (Y/N) _____
9. Open humidistat input compressor and outdoor fan stop; LSV and DSV solenoids de-energized (Y/N) _____
10. Restore set-points for thermostat and humidistat (Y/N) _____
Содержание 50HC Series
Страница 4: ...4 Fig 2 50HC 04 06 Units Built On and After 4 15 2019...
Страница 5: ...5 Fig 3 50HC 04 06 Units Built Prior to 4 15 2019...
Страница 6: ...6 Fig 4 50HC 04 06 Corner Weights and Clearances...
Страница 7: ...7 Fig 5 50HC 04 06 Base Rail Details...
Страница 8: ...8 Fig 6 50HC 04 06 Thru the Base Charts...
Страница 25: ...25 Fig 47 Electro Mechanical Control Wiring Diagram...
Страница 26: ...26 Fig 48 Electro Mechanical Control Wiring Diagram with Humidi MiZer System...
Страница 27: ...27 Fig 49 Electro Mechanical Control Power Wiring Diagram...
Страница 29: ...29 Fig 51 50HC ComfortLink Control with Humidistat Power Wiring Diagram 208 230V 460V 575V 3 Phase...
Страница 30: ...30 Fig 52 50HC ComfortLink Control with Humidi MiZer System Power Wiring Diagram 208 230V 460V 575V 3 Phase...
Страница 31: ...31 Fig 53 PremierLink Wiring Schematic...
Страница 32: ...32 Fig 54 PremierLink Wiring Schematic with Humidi MiZer System...
Страница 33: ...33 Fig 55 RTU Open System Control Wiring Diagram...
Страница 34: ...34 Fig 56 RTU Open System Control Wiring Diagram with Humidi MiZer System...
Страница 49: ......