
28
Fig. 40 —
Typical Smoke Detector System Wiring
Sensor and Controller Tests
SENSOR ALARM TEST
The sensor alarm test checks a sensor’s ability to signal an alarm
state. This test requires the use of a field provided SD-MAG test
magnet.
Sensor Alarm Test Procedure
1. Hold the test magnet where indicated on the side of the sensor
housing for seven seconds.
2. Verify that the sensor’s Alarm LED turns on.
3. Reset the sensor by holding the test magnet against the sensor
housing for two seconds.
4. Verify that the sensor’s Alarm LED turns off.
CONTROLLER ALARM TEST
The controller alarm test checks the controller’s ability to initiate
and indicate an alarm state.
Controller Alarm Test Procedure
1. Press the controller’s test/reset switch for seven seconds.
2. Verify that the controller’s Alarm LED turns on.
3. Reset the sensor by pressing the test/reset switch for two
seconds.
4. Verify that the controller’s Alarm LED turns off.
DIRTY CONTROLLER TEST
The dirty controller test checks the controller’s ability to initiate a
dirty sensor test and indicate its results.
Dirty Controller Test Procedure
1. Press the controller’s test/reset switch for two seconds.
2. Verify that the controller’s Trouble LED flashes.
DIRTY SENSOR TEST
The dirty sensor test provides an indication of the sensor’s ability
to compensate for gradual environmental changes. A sensor that
can no longer compensate for environmental changes is consid
-
ered 100% dirty and requires cleaning or replacing. Use a field
provided SD-MAG test magnet to initiate a sensor dirty test. The
sensor’s Dirty LED indicates the results of the dirty test as shown
in Table 6.
B
D
F
E
A
C
48TM502525 D
NOTICE: OPERATIONAL TEST NOTICE
Failure to follow this NOTICE may result in an unnecessary
evacuation of the facility.
This test places the duct detector into the alarm state. Unless
part of the test, disconnect all auxiliary equipment from the con
-
troller before performing the test. If the duct detector is connect
-
ed to a fire alarm system, notify the proper authorities before
performing the test.
NOTICE: OPERATIONAL TEST NOTICE
Failure to follow this NOTICE may result in an unnecessary
evacuation of the facility.
This test places the duct detector into the alarm state. Unless
part of the test, disconnect all auxiliary equipment from the con
-
troller before performing the test. If the duct detector is connect
-
ed to a fire alarm system, notify the proper authorities before
performing the test.
NOTICE: OPERATIONAL TEST NOTICE
Failure to follow this NOTICE may result in an unnecessary
evacuation of the facility.
Pressing the controller’s test/reset switch for longer than seven
seconds will put the duct detector into the alarm state and acti
-
vate all automatic alarm responses.
NOTICE: OPERATIONAL TEST NOTICE
Failure to follow this NOTICE may result in an unnecessary
evacuation of the facility.
Holding the test magnet against the sensor housing for more
than seven seconds will put the duct detector into the alarm
state and activate all automatic alarm responses.
Содержание 48TC series
Страница 40: ...40 Fig 56 Typical IGC Wiring Diagram...
Страница 41: ...41 Fig 57 Integrated Gas Control IGC Board RED LED STATUS...
Страница 47: ...47 Fig 62 RTU Open Overlay for Economizer Wiring...
Страница 48: ...48 Fig 63 VFD Overlay for W2770 Controller Wiring...
Страница 96: ...96 Fig C 48TC D17 D30 Control Diagram 208 230 3 60 460 3 60 575 3 60 APPENDIX D WIRING DIAGRAMS...
Страница 97: ...97 Fig D 48TC D17 D30 Power Diagram 208 230 3 60 APPENDIX D WIRING DIAGRAMS...
Страница 98: ...98 Fig E 48TC D17 D30 Power Diagram 460 3 60 APPENDIX D WIRING DIAGRAMS...
Страница 99: ...99 Fig F 48TC D17 D30 Power Diagram 575 3 60 APPENDIX D WIRING DIAGRAMS...
Страница 100: ...100 Fig G 48TC D17 D30 Control Diagram with Humidi MiZer System APPENDIX D WIRING DIAGRAMS...
Страница 101: ...101 Fig H 48TC D17 D30 Power Diagram 208 230 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS...
Страница 102: ...102 Fig I 48TC D17 D30 Power Diagram 460 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS...
Страница 103: ...103 Fig J 48TC D17 D30 Power Diagram 575 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS...
Страница 104: ...104 Fig K PremierLink System Control Wiring Diagram APPENDIX D WIRING DIAGRAMS...
Страница 105: ...105 Fig L PremierLink System Control Wiring Diagram with Humidi MiZer System APPENDIX D WIRING DIAGRAMS...
Страница 106: ...106 Fig M RTU OPEN Wiring Diagram APPENDIX D WIRING DIAGRAMS...
Страница 107: ...107 Fig N RTU OPEN Wiring Diagram with Humidi MiZer System APPENDIX D WIRING DIAGRAMS...
Страница 109: ......