background image

2

CONTENTS

Page

Start-up checklist .......................................................................................................................................................................... 3

Dimensions/clearances ................................................................................................................................................................. 4

Technical/electrical data .............................................................................................................................................................. 6

Application data ............................................................................................................................................................................ 7
Maximum cooler water flow rates .................................................................................................................................................. 7
Water loop volume ......................................................................................................................................................................... 7

Installation ..................................................................................................................................................................................... 7
Safety considerations ...................................................................................................................................................................... 7
Preliminary checks ......................................................................................................................................................................... 8
Moving and siting the unit .............................................................................................................................................................. 8
Check compressor mountings ......................................................................................................................................................... 8

Water connections ........................................................................................................................................................................ 9

Power supply ............................................................................................................................................................................... 10
Electrical checks ........................................................................................................................................................................... 10

Start-up ........................................................................................................................................................................................ 10
Preliminary checks ....................................................................................................................................................................... 10
Actual start-up .............................................................................................................................................................................. 10

Servicing refrigeration components .......................................................................................................................................... 11
General maintenance .................................................................................................................................................................... 11
Liquid refrigerant charging ........................................................................................................................................................... 11
Compressors ................................................................................................................................................................................. 12
Compressor protection circuit board (STARTERGUARD) ......................................................................................................... 12
Heat exchangers ............................................................................................................................................................................ 13
Condenser coil .............................................................................................................................................................................. 14
Fan motor replacement ................................................................................................................................................................. 15
Fan motor protection .................................................................................................................................................................... 15
Refrigerant circuit ......................................................................................................................................................................... 15

Troubleshooting chart ................................................................................................................................................................ 16

The photo on the front cover  is only for illustration purposes and not contractually binding (photo shows unit with optional
compressor sound enclosure).
The manufacturer reserves the right to make  modifications at any time without prior notice.

Содержание 30GH 040

Страница 1: ...and maintenance instructions 30GH 040 245 30GZ 040 245 Air cooled liquid chillers 50 Hz Carrier is participating in the Eurovent Certification Programme Products are as listed in the Eurovent Directo...

Страница 2: ...hecks 10 Actual start up 10 Servicing refrigeration components 11 General maintenance 11 Liquid refrigerant charging 11 Compressors 12 Compressor protection circuit board STARTERGUARD 12 Heat exchange...

Страница 3: ...temperature C Pressure drop air kPa Pressure drop water kPa Discharge air pressure Pa Fan speed r s or rpm Fan motor input Ph 1 V Ph 2 V Ph 3 V Ph 1 V Ph 2 V Ph 3 V Ph 1 V Ph 2 V Ph 3 V Ph 1 V Ph 2 V...

Страница 4: ...85 145 Do not obstruct 30GH GZ A B C D E F G 040 045 2450 1870 1912 2500 1200 500 1200 050 060 2900 2156 2060 2500 1200 500 1200 085 100 3404 2328 2471 1600 1800 1600 1800 120 145 4322 2328 2471 1600...

Страница 5: ...not obstructed At least two sides of the units must be free from obstructions to ensure proper air flow If several units are installed next to each other ensure that the space in between the units is...

Страница 6: ...150 DN150 Drain NPT in 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 Max water side operating pressure kPa 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000...

Страница 7: ...ing of the liquid water or brine Refer to the examples below NOTE The compressor must not restart more than 6 times in an hour INSTALLATION SAFETY CONSIDERATIONS Installation start up and servicing th...

Страница 8: ...Siting Before siting the unit check that the permitted loading at the site is adequate or that appropriate strenghtening measures have been taken the surface is horizontal flat and intact there is ade...

Страница 9: ...valves close to the evaporator in the entering and leaving water lines Use flexible connections to reduce the transmission of vibration to the pipework Insulate all pipework after testing for leaks b...

Страница 10: ...he lubricating oil from absorbing refrigerant Check the operation of all accessories chilled water circulating pumps air handlers and other equipment connected to the evaporator Follow the individual...

Страница 11: ...H or 12 K 30GZ of subcooling as the liquid refrigerant enters the expansion valve The units 30GH GZ 040 245 use refrigerant For your information we are reproducing here some extracts from the official...

Страница 12: ...xchangers Evaporator Protection devices Freeze up prevention thermostat The evaporator is protected against freeze up The protection is provided by two sensors installed in the unit Significant underc...

Страница 13: ...r Carrier distributor Replacing cooler tubes Retubing must be done only by a properly trained service engineer Most standard practices can be applied but for cooler tubes a 5 crush allowance is made f...

Страница 14: ...or rotating water jets are strictly forbidden Correct and frequent cleaning approximately every three months will prevent 2 3 of the corrosion problems Fan motor replacement This presents no special p...

Страница 15: ...efective compressor Refrigerant losses Refrigerant losses Low water flow in the evaporator Blocked expansion valve Blocked filter drier Defective high pressure switch Defective fan s Low water flow in...

Страница 16: ...7 Supersedes order No 13187 76 July 1996 Printed on Totally Chlorine Free Paper Manufacturer reserves the right to change any product specifications without notice Printed in the Netherlands Manufactu...

Отзывы: