1. INSTALLATION
1-1. USE ENVIRONMENT
1-1-1. Machine room
Absorption Chiller is indoor use ONLY.
IP number of Absorption Chiller is IP40.
Please keep the machine room temperature between 5
℃
and 40
℃
for protection of the solution
crystallization during chiller shut down. Please keep the humidity in the machine room within 90%.
a) When performing crane work, please avoid bad weather such as strong wind.
b) Please establish so that a crane may become stable in the ground.
c) Please refer to lifting data of Contract specifications for lifting method of the chiller/heater.
d) Please select a hanging wire with the enough strength by marking reference to weight data
of Contract specifications.
e) The wire to use please carry out prior visual inspection and periodical inspection.
1-1-2. Field wiring
For CE, please connect to power source by overvoltage category
Ⅲ
, and to other wiring by
overvoltage category
Ⅱ
.
1-1-3. Altitude
Please install Absorption Chiller at a height of less than 1000m above sea level.
If the location is higher than 1000m above sea level, please contact Carrier agent.
1
Содержание 16LJ-01
Страница 1: ...Absorption Chiller INSTALLATION MANUAL 16LJ 01 02 03 Original instructions ...
Страница 28: ...Exhibit H LiBr solution material safty data sheet ...
Страница 29: ......
Страница 30: ......
Страница 31: ......