SPRING
PIN
D
E
INCORRECT
CORRECT
B
H
B
H
A
F
G
B
F
G
H
Insert top horizontal bar through top of mesh (I). Repeat on lower horizontal bar.
Connect top end cap (A) to top bar.
Insert right side bar (D,E) into side of mesh and connect to top handle end cap (B),
then to the bottom handle end cap (H).
Align inner leg tube (E) into outer leg tube (D) and push together past pin
engagement.
NOTE:
See STEP 6 for pin engagement at the end of assembly.
Assembling and Installing Your Gate
STEP 1
Measure your doorway or wall opening and subtract 2 inches to account for
“A” and “C”.
Set tubes to length. Connect outer tube (F), middle tube (G), and handle
end cap (B,H). Repeat on bottom side. Top and horizonal bars width must match.
Top and bottom handles (B,H) must be fully loosened when measuring opening.
For smaller openings, adjust B, G & H, G first.
NOTE:
Make sure spring pins are secured in place to ensure tubes cannot pull apart.
STEP 2
STEP 3
STEP 4