![Carbolite Gero HTRH Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/carbolite-gero/htrh/htrh_operating-instructions-manual_2555717012.webp)
Page 12
Delivery
Check
completeness
Compare scope of delivery with delivery note and ordering documents.
Missing parts or damages resulting form inadequate packing or
transport must be reported immediately to the forwarder or supplier.
Packing
The type of packing used depends on the transport route.
If necessary, the furnace is delivered in transport units.
Installation and connection to the mains
Installation
It is recommended to have the furnace installed by
CARBOLITE-GERO-Service.
Position the furnace components with a fork-lifter or in accordance with
the layout plan and adjust all units to their exact height, angle, and
position.
Securing of the
plant
Re-fix all de-mounted parts and check their proper function. Check firm
position of complete furnace.
Connection to
the mains
Only skilled personnel are allowed to carry out the installation of the
mains connection while observing the relevant local regulations and
legal provisions.
Check if mains voltage and frequency are identical with the values
stated on the rating plate.
Cooling system The furnace is provided with housing with convection cooling. The flow
of fresh and waste air must not be restricted to avoid overheating.