3
Fig. 2
Fig. 1
Fig. 3
Fig. 4
MOTOR PULLEY ASSEMBLY
Fix the motor pulley Fig. 1 (A) onto the motor shaft mak-
ing sure the hub of the pulley is facing out. Inser t key
into the keyway of the pulley and motor shaft. Make
sure you tighten the set screw Fig. 1 (C) with the allen
wrench supplied.
ALIGNING BELT PULLEYS
Place the belt around the pulleys on the motor and the
cutterhead. Using a straight edge on the face of both
pulleys make sure they are in line. If adjustment is
needed, the motor pulley can be moved foreward or
back on the motor shaft. An altenative is to loosen the
screws on the motor mounting plate Fig. 1 (B) and shift
the motor for ward or back, be sure to tighten them
again after wards.
CHECKING BELT TENSION
If the belt tension is correct, there should be 1" deflec-
tion at the centre span of the belt. If adjustment is
needed,the motor may be raised or lowered by loosen-
ing the motor mounting screws and pushing the motor
up or down to adjust tension. Don't forget to retighten
the screws after positioning is complete. Recheck pulley
alignment to ensure it has not been disturbed. Once you
are satisfied with the belt pulley arrangement, replace
the side panel.
PULLEY GUARD AND CARRIAGE MOUNTING
BRACKET
It is essential for the safe use of the machine that the
pulley guard Fig. 2 (A) is in place before operating the
jointer. Position the two alignment pins in the pulley
guard, with the two holes in the side of the jointer,
attach guard using the 4 x 55mm long hex head screws
Fig. 2 (E). Attach carriage assembly Fig. 2 (B) to carriage
mounting bracket Fig. 2 (D) using the 2 of 8 x 20mm
long hex socket screws supplied Fig. 2 (C).
FENCE ASSEMBLY
The fence is fitted to the carriage assembly via the two
holes in the front plate Fig 2. (F). The shor t fence han-
dle Fig. 3 (A) is fitted to the to the infeed side of the
fence, and the longer handle to the outfeed side (not
shown).
COMPLETED FENCE ASSEMBLY FIG. 4
A
C
A
F
A
E
D
C
B
B
B
Содержание CTJ-196
Страница 2: ...6 JOINTER MODEL CTJ 196 INSTRUCTION MANUAL...
Страница 10: ...9...
Страница 11: ...10...
Страница 12: ...11...
Страница 13: ...12...
Страница 14: ...13...
Страница 15: ...14 ALL ELECTRICAL WORK SHOULD BE UNDERTAKEN BY A LICENSED ELECTRICAL CONTRACTOR...
Страница 16: ...15 NOTES...