
CANYON FURNITURE COMPANY.
A.- (1) STEP UNIT
B.- (1) TOP BUNK BED
C.- (2) METAL DOWEL PINS
D.- (1) FOOTBOARD
E.- (1) HAND RAIL
F.- (1) BACK FRAME
G.- (2) 100MM BOLTS
H.- (4) 35MM BOLTS
I.- (6) CAP NUTS
J.- (1) 4MM ALLEN WRENCH
K.-(1) 5MM ALLEN WRENCH
L.-(4) 1 1/2" PAN HEAD SCREWS
M.- (4) SIDE RAILS
N.-(2) GUARD RAILS
O.- (24) 80MM FLAT HEAD BOLTS
P.- (24) 5/8" CROSS DOWEL NUTS
K.- (1) 5MM ALLEN WRENCH
Q.- (1) 6 DRAWER DRESSER
R.- (1) 3 DRAWER COMPUTER DESK
S.- (4) SLATS
T.- (8) 1 1/4" SCREWS
U.- (1) HEADBOARD
V.- (1) FOOTBOARD
W.- (1) 2 DRAWER NIGHT STAND
1.- TO ASEMBLE STEP BUNK BED, USING ONE TOP BUNK BED (B), ONE FOOTBOARD (D), TWO SIDE RAILS (M), TWO GUARD RAILS (N), ONE 6 DRAWER DRESSER (Q) OR ONE 3 DRAWER COMPUTER DESK (R)
2.- REMOVE FACTORY INSTALLED PLASTIC PLUGS FROM THE TOP OF DRESSER OR THE TOP OF THE DESK , THEN INSERT ONE METAL DOWEL PIN ( C ) IN EACH HOLE OF THE TOP, TAKE THE TOP BUNK BED END ( B )
PLACE IT ON TOP OF THE DRESSER OR DESK WITH THE GROVE LINES FACING LIKE FIG.8, ALIGNING THE METAL DOWEL PINS WITH THE BOTTOM HOLES OF TOP BUNK BED END UNTIL ARE ALL THE WAY IN, SEE FIG.8
3.- INSERT TWO CROSS DOWELS (P) IN ACCESS HOLE INSIDE THE SIDE RAIL & GUARD RAIL, ALIGN THE CROSS DOWEL NUT, MAKE SURE THE GROOVE IS HORIZONTAL, SEE FIG.9
4.- ATTACH TWO SIDE RAILS ( M ), TWO GUARD RAILS ( N ) TO TOP BUNK BED ( B ) & FOOTBOARD (D), INSERTING TWO 80MM FLAT HEAD BOLTS ( O ) INTO TO TOP BUNK BED&FOOTBOARD HOLES, USE THE 5MM ALLEN
WRENCH (K) TO TIGHTEN BOTH FLAT HEAD BOLTS
( DO NOT TIGHTEN COMPLETELY UNTIL ALL PIECES ARE CONNECTED TOGETHER ),
REPEAT THE SAME PROCESS AT ALL FOUR CORNERS, SEE FIG.10
5.- PLACE 4 SLATS (S) ON TOP SIDE RAIL CLEATS, ONE SLAT IN BOTH TOP BUNK BED & FOOTBOARD ENDS, PUSH THE SLATS AGAINST THE BED END POST (FIG.A) AND TWO SLATS IN THE MIDDLE AT EQUAL DISTANCE
FROM THE END SLATS, THEN EACH SLAT MUST BE FASTEN WITH ONE 1 1/4" SCREW (T), SEE FIG.11
( USE ONE 4 PCS SLAT PACK (98-645) )
HARDWARE PACK
(HPK00012)
6 DRAWER DRESSER BOX ( 98-208 ) FIG.5
3 DRAWER COMPUTER DESK BOX ( 98-602 ) FIG.5
STEP BUNK BED END BOX ( 98-703 ) FIG.3
HARDWARE PACK
(HPK00026)
6 PCS SIDE RAILS BOX ( 98-730 ) FIG.4
HARDWARE PACK
(HPK00104)
4 PCS SLAT PACK BOX ( 98-645,98-646 ) FIG.6
STEP BUNK BED UNIT ASSEMBLY INSTRUCTIONS CONFIGURATION TYPE # 2
LIST OF CONTENTS
TWIN/FULL BED BOX ( 98-707,98-709 ) ( FIG.7 )
HARDWARE PACK
(HPK00016)
COTTAGE COLORS COLLECTION
STEP BUNK BED UNIT BOX ( 98-161 ) FIG.1
BUNK BED TOP END BOX ( 98-705 ) FIG.2
2 DRAWER NIGHT STAND BOX ( 98-502 ) ( FIG.8 )
OPTIONAL
A
FIG. 1
B
C
FIG. 2
D
E
F
G
H
I
J
FIG. 3
K
L
N
O
M
P
K
FIG. 4
Q
R
FIG. 5
S
T
FIG. 6
V
U
FIG. 7
W
FIG. 8
YES,
HORIZONTAL GROOVE
NO
FIG. 9
FIG. 8
FIG. 10
FIG. 11
FIG.A
REV 01 01/08/16
PAGE 4 OF 6
KIS01129
Содержание 98-161
Страница 12: ......