For this step:
Tools required
STEP 19
STEP 20
Page
16
of
18
Version 1 - 210821
CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS
J
S
x4
Fittings required
S x4
J x4
For this step:
Tools required
Hx6
P
Q
H
H
H
H
23
22
24
Fittings required
H x20
P x2
Q x2
LOOSELY FIT THE SWIVELS (P&Q)
TO EACH SIDE OF THE FLAP (22) USING
SCREWS (H)
.
DO NOT TIGHTEN SCREWS 100% YET.
i.
ii.
GENTLY LEAN SWIVELS (P&Q) OUTWARDS
AND SLIDE THE BASE (23) INTO THE GUIDES.
SLIDE IN THE OUTER PARTITION (24) AND
MAKE SURE THE PANELS ARE SITTING
EVENLY IN EACH GROOVE, CAREFULLY
TIGHTEN THE SIX SCREWS (H) 100%
iii.
CLAMP BASE PANEL (23) AND
OUTER PARTITION (24) TO THE
SWIVELS USING SCREWS (H).
x2 SETS
CAREFULLY INSERT THE LOWER
ASSEMBLED CARRIAGE INTO
POSITION BETWEEN THE SIDE
PANELS, INSERT PIVOT
PIN
S (
S
) AND
USING SCREWS (
J
) FIX INTO PLACE
,
DO NOT OVERTIGHTEN THE SCREWS.
THE CARRIAGE MUST BE KEPT LEVEL
WHEN DOING THIS TASK SO PLEASE
SEEK HELP FROM YOUR ASSISTANT.
REPEAT FOR UPPER CARRIAGE.