background image

CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS

Version 1 - 210821

PO No

Page 

1

 of 

18

PLEASE READ

this sheet prior to assembly to familiarise yourself with the various stages of construction.

Carefully open the pack supplied and check the contents against the parts and fittings check list. Do not

destroy any of the packaging until you are certain that you have all the necessary parts for the assembly.

CAUTION:

There are small components used in the construction of this unit. These loose items should be

kept away from young children whilst assembling your unit to avoid the danger of choking.

Tools Required

1

1/4 

 Hour

Set Up

Thank you for purchasing the Canyon Shoe Cabinet.

Please read the instructions carefully to ensure safe operation of this product. 

Size: 

Colour:

81 x 24 x 108  cm

 

(WDH) 

Dark Oak

Содержание 2 TIER SHOE CABINET

Страница 1: ...estroy any of the packaging until you are certain that you have all the necessary parts for the assembly CAUTION There are small components used in the construction of this unit These loose items should be kept away from young children whilst assembling your unit to avoid the danger of choking Tools Required 11 4 Hour Set Up Thank you for purchasing the Canyon Shoe Cabinet Please read the instruct...

Страница 2: ... not included unless specified in parts list WARNINGS This product should only be used on a firm and level floor Keep small parts out of reach of children Make sure the base remain in contact with the floor DO NOT DO NOT DO NOT DO NOT DO NOT use power tools to construct this product tighten screws until parts are assembled or as advised in this guide over tighten screws or bolts use this product i...

Страница 3: ...Please check the pack contents before assembling the product If any components are missing please contact your retailer The fittings pack contains small items that should be kept away from children 4 1 2 3 8 9 10 5 6 7 Version 1 210821 23 x2 24 24 22 13 14 14 15 17 16 18 19 20 21 11 11 12 12 ...

Страница 4: ...ack Rail Description Front Rail Qty 2 Qty 2 Size 668 x 50 x 15 mm Carton No 1 1 11 12 10 Description LH Inner Side Qty 1 Size 1005 x 208 x 12 mm Carton No 1 1 Description Drawer Back Qty 1 Size 641x 104 5 x 12 mm Carton No 1 1 Description Cover Rail Qty 2 Size 190 x 40 x 12 mm Carton No 1 1 Description Drawer Front Qty 1 Size 665 x 160 x 15 mm Carton No 1 1 Carton No 1 1 16 17 18 Qty 1 Size 776 x ...

Страница 5: ...t 38mm overall Short Cam Bolt 25mm overall Fittings to scale 10 20 30 40 50 60 70 80 D 4 Connection Bolt M6x25mm Screw for Fitting Drawer Stop N and Back Panel 3x12mm Screw for Fixing Anti tilt Metal Bracket to underside of fixed shelf 4x12mm Carcass Assembly Screws 4 x35mm Screw for Fitting Swivel to Flap 3 5x16mm Screw for Fitting Plinth to Front Upright 4 x28mm Screw for Fitting Pivot Pin S 4x1...

Страница 6: ...r Fitting to Side Panel U 1 Drawer Stop General Hints Tips B or E Tighten A or D A or D 28mm D 17 5mm A Stop when level Metal Anti tilt Bracket for Fixing Cabinet to the Wall Page 6 of 18 Version 1 210821 1 M Allen Key 4mm Shoe Carriage Swivel Left Hand Shoe Carriage Swivel Right Hand Shoe Carriage Stop Shoe Carriage Swivel Pivot Pin ...

Страница 7: ...this step Tools required R x4 Tx2 Tx2 Kx12 U L Rx2 Rx2 Fittings required T x4 U x1 L x1 Page 7 of 18 Version 1 210821 K x12 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS 6 6 7 7 15 15 12 12 R T Align the parts R T then carefully tap into place using a light hammer ...

Страница 8: ...4 Fittings required For this step Tools required STEP 3 STEP 4 For this step Tools required Fittings required Page 8 of 18 Version 1 210821 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS 16 K x4 K x4 11 11 ...

Страница 9: ...d STEP 5 STEP 6 For this step Tools required Fittings required Page 9 of 18 Version 1 210821 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS Ax3 Ax3 Ax2 Bx3 Cx2 Cx2 Bx3 Bx4 Ax2 4 2 3 5 5 4 Fittings required A x10 B x6 C x4 B x4 ...

Страница 10: ...For this step Tools required STEP 7 STEP 8 For this step Tools required Page 10 of 18 Version 1 210821 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS Ax6 Ax2 Cx2 Vx2 V x2 Bx2 Fittings required A x8 B x2 C x2 1 8 8 9 10 ...

Страница 11: ...tings required For this step Tools required STEP 9 STEP 10 For this step Tools required Fittings required Page 11 of 18 Version 1 210821 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS Kx4 K x4 14 14 Fx4 M F M ...

Страница 12: ...quired STEP 11 STEP 12 For this step Tools required Fittings required Page 12 of 18 Version 1 210821 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS Dx4 Kx4 Ex4 i ii iii iv 17 17 18 19 21 20 Fittings required D x4 E x4 K x4 ...

Страница 13: ...uired For this step Tools required STEP 13 STEP 14 For this step Tools required N x2 Fittings required G x2 C x2 Page 13 of 18 Version 1 210821 B x6 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS 1 G N x2 Bx6 Cx2 ...

Страница 14: ...age 14 of 18 Version 1 210821 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS STEP 15 STEP 16 For this step Tools required Fittings required For this step Tools required Fittings required G x6 Gx6 13 13 ...

Страница 15: ... wires water and gas pipes Choose a suitable wall fixing method Page 15 of 18 Version 1 210821 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS STEP 17 STEP 18 For this step Tools required For this step Tools required Fittings required L U Hold cabinet firmly against the wall If necessary loosen screw L a little and push the bracket U until it touches the wall Screw into your wall fixing making su...

Страница 16: ...EAN SWIVELS P Q OUTWARDS AND SLIDE THE BASE 23 INTO THE GUIDES SLIDE IN THE OUTER PARTITION 24 AND MAKE SURE THE PANELS ARE SITTING EVENLY IN EACH GROOVE CAREFULLY TIGHTEN THE SIX SCREWS H 100 iii CLAMP BASE PANEL 23 AND OUTER PARTITION 24 TO THE SWIVELS USING SCREWS H x2 SETS CAREFULLY INSERT THE LOWER ASSEMBLED CARRIAGE INTO POSITION BETWEEN THE SIDE PANELS INSERT PIVOT PINS S AND USING SCREWS J...

Страница 17: ...required For this step Tools required STEP 21 STEP 22 Page 17 of 18 Version 1 210821 CANYON 2 TIER SHOE CABINET ASSEMBLY INSTRUCTIONS H H H H H 24 24 H x4 SLIDE CENTRAL PARTITIONS 24 INTO THE SWIVEL GUIDES CLAMP CENTRAL PARTITIONS 24 IN PLACE USING SCREWS H ...

Страница 18: ...age 18 of 18 Assembly Completed Your Canyon Shoe Cabinet is now completely assembled Periodically check to ensure that the components are in their proper position free from damage Also make sure the connectors are tight and secure Keep instructions for future reference ...

Отзывы: