background image

HZ1700-E

1

Cantaport

 made in Japan certified to AU standards 

PJR-series

 

M

 connection manual

   

Thank you very much for choosing our company's Cantaport products.

Please be sure to thoroughly read these instructions for assembling the Cantaport product in conjunction with the engineering 

details. DIY or Authorisied Cantaport installations must follow the manufactures assembling manual to avoid warranty cover. 

Please retain the manual for future reference and maintenance inspection. 

Precautions during construction

The Cantaport is a simple structure. Do not change or remodel it without gaining

certification from Cantaport to avoid warranty or danger to public.

The snow accumulation strength is 600N/m2 (61.2kg/m2) which corresponds to 20cm

of fresh snowfall (specific weight 0.3). Do not install in heavy snow area.

Do not install it in the place where snow slides down from the building roof directly.

There is a possibility that products are damaged by snow falling.

When installing it besides wall, etc., keep enough clearance between the product and

the wall due to avoid damage during strong winds. 100mm-200mm clearance.

Do not install in locations subject to strong wind directly/constantly underneath the roof.

When installing, it is recommended to install the front frame facing towards the building to reduce the wind effect.

When installing with side panel  please be sure to install the support post.

Positioning the posts so that they do not affect underground services (water supply, drain pipes, etc.).

When moving the posts, please follow the manufactures specifications detailed in this manual.

Install so that the exhaust of hot-water steam, heating fumes and/or car exhaust do not directly hit the surface of the supports

and around the entire frame. This may cause discolouration of the surface structure.

enough 

space

enough 

space

concrete wall 

etc

TO BE READ INCONJUCTION WITH THE PJR SINGLE

INSTALLATION MANUAL.

Содержание PJR Series

Страница 1: ...lides down from the building roof directly There is a possibility that products are damaged by snow falling When installing it besides wall etc keep enough clearance between the product and the wall d...

Страница 2: ...st type adjusting to post position of 3 post type Strike the front frames and do sealing work below figure A part Peel the back sheet of water proof cover and attach the water proof cover on the joint...

Страница 3: ...JRG B 1 2 PJRG B PJRG B 1 3 2 PJRG B PJRG B 1 9 8 5 4 PJRG B PJRG B 1 Washer 8 8 4 PJRG B PJRG B 1 16 8 PJRG B PJRG B 1 Hexagon bolt M8 85 8 4 PJRG B PJRG B 1 Nut M8 8 4 PJRG B PJRG B 1 1 PJRG B PJRG...

Страница 4: ...the post for D18 In case of f implant the post for D33 175 1mm deeper than the post for D18 In case of g implant the post for D24 36 5mm deeper than the post for D21 In case of h implant the post for...

Страница 5: ...5 55 5 56 55 5 56 56 55 5 56 55 54 5 D1 D2 18type 18type 21type 21type 24type 24type 25type 25type 27type 27type 30type 30type 33type 33type 18type 21type 18type 24type 18type 25type 18type 27type 18...

Страница 6: ...rval and set in the front frame connecting parts Fix the front frame connecting parts to the back plate inserted into the connecting material with small truss screw 5 15 10 Set in Insert Front frame c...

Страница 7: ...connecting cap Insert the connecting cap to connecting material and fix with drilling screw 4 10 8 Do sealing work to the touching part Drilling screw 4 10 8 Front frame Connecting cap Connecting mat...

Страница 8: ...WB 48 70 4675 4 WB 48 70 D 4223 2 WB 42 70 4083 2 WB 42 70 Post Internal WB 51 4811 2 Post Internal WB 54 5126 Post Internal WB 60 5715 4 Post Internal WB 42 3943 2 Post Internal WB 48 4535 4 Post Cen...

Страница 9: ...OM ENDS FOOTING DETAILS PIT FOOTING 900 x 900 x 900 PILE FOOTING 450 x 1500 BMS450 SMS65 METAL SLEEVE ADVANTAGE 1 Eliminates error in height The metal sleeves are inserted into the concrete footing an...

Страница 10: ...of edge of SHS 130 Keep brace rod clear of edge of SHS Footing 900x900x900 Footing 450 dia x 1500 65 x 65 x 3 SHS Existing Ground level FRONT ELEVATION FRONT ELEVATION Footing 450 dia x 1500 65 x 65 x...

Страница 11: ...Existing concrete driveway Baseplate to cover concrete access hole Ramset Chemset 101 Plus with N16 Grade 500 Threaded Rod Hole depth Min 200mm Footing 900x900x900 Footing 450 dia x 1500 Existing conc...

Отзывы:

Похожие инструкции для PJR Series