Chapter 3
3-4
3.3
Installation procedure
3.3.1
Installation
0007-7276
1. Turning Off the Host Machine
Before starting the work, be sure to perform the following on the host machine in strict
order:
1. Hold down on the control panel power switch for 3 sec or more.
2. Go through the instructions indicated on the control panel touch panel (for shutdown
sequence) so that the host machine's main power switch may be turned off.
3. Turn off the main power switch.
4. Disconnect the power cable (from the wall outlet).
F-3-3
[4]
[3]
[2]
[1]
ON/OFF
Содержание Multi-PDL Printer Kit-E1
Страница 6: ...Chapter 1 Specifications ...
Страница 13: ...Chapter 2 Functions ...
Страница 24: ...F 2 4 F 2 5 ...
Страница 28: ...Chapter 3 Parts Replacement Procedure ...
Страница 36: ......
Страница 42: ...Chapter 1 Specifications ...
Страница 51: ...Chapter 2 Functions ...
Страница 60: ... Up to 50 Secured Print jobs of image data being rendered and left unprinted can be stored F 2 3 Chapter 2 2 8 ...
Страница 61: ...F 2 4 Chapter 2 2 9 ...
Страница 62: ...Chapter 2 2 10 F 2 5 F 2 6 ...
Страница 67: ...Chapter 3 Parts Replacement Procedure ...
Страница 71: ......