
Jam code
Jam type
Sensor
Jam description
1804
Staple-free staple jam
-
Staple operation timeout error:
The clinch unit rotation sensor (PS13) cannot detect the re-
duction in revolution within 2 seconds of starting the clinch
motor (M9) operation.
1805
Post-staple-processing operation timeout error:
The clinch HP sensor (PS15) does not turn off even when 4
seconds have elapsed after the clinch motor (M9) starts run-
ning.
1C14
Error avoidance jam
-
Assist motor error (E514)
1C16
Paddle motor error (E516)
1C30
Rear alignment motor error (E530)
1C32
Stapler shift motor error (E532)
1C35
Return belt motor error (E535)
1C37
Front alignment motor error (E537)
1C40
Tray shift motor error (E540)
1C77
Paddle motor error (E577)
1F01
Paper feed cancellation jam
-
The finisher receives a paper feed cancellation instruction
from the host machine for paper delivered according to a
paper reception notification signal.
1F32
Manual stack insertion jam
-
A paper stack is inserted in the manual staple slit while the
stapler unit is moving. This is not detected when the stapler
unit is moving to the staple replacement position.
1F90
Operation preparation/comple-
tion response timeout jam
-
A start response cannot be returned within 60 seconds of
receiving a start request signal.
An operation completion response cannot be returned within
60 seconds of receiving an operation completion request
signal.
2. Technical Explanation
34
Содержание Inner Finisher-H1
Страница 1: ...Revision 3 0 Inner Finisher H1 Service Manual ...
Страница 10: ...Product Overview 1 Features 5 Specifications 6 Name of Parts 9 ...
Страница 43: ...Periodical Service 3 List of Work for Scheduled Servicing 38 ...
Страница 80: ... 3 2 1 4 Parts Replacement and Cleaning 74 ...
Страница 81: ...Adjustment 5 Overview 76 Basic Adjustment 79 Adjustment when Replacing the Parts 83 Service Label 84 ...
Страница 97: ...Installation Outline Drawing 1 8 8 6 5 8 2 3 4 7 9 10 11 6 Installation 91 ...
Страница 106: ...APPENDICES Service Tools 101 General Circuit Diagram 102 ...