imagePRESS 1125P Customer Expectations Document
Page 47
The table below indicates the estimated length of time needed to install the main
unit and optional accessories from the time the machine is unpacked to when it is
installed, and calculated from the average amount of manpower hours. The
estimated installation times are based on four (4) experienced technicians.
Description
Estimated Time
imagePRESS 1125P – Main Unit
37 Minutes
Color Image Reader-L1
13 Minutes
POD Deck-C1
16 Minutes
Secondary POD Deck-C1
49 Minutes
Multi Drawer Document Insertion Unit-A1
33 Minutes
High Capacity Stacker-E1
12.5 Minutes
Secondary High Capacity Stacker-E1
15.5 Minutes
Professional Puncher-B1 + Professional Puncher Integration Unit-A1
17.5 Minutes
Perfect Binder-C1
36.5 Minutes
Paper Folding Unit-F1
(When connecting it with the Finisher-AF1/Saddle Finisher-AF2)
11 Minutes
Perfect Binder-C1
11.5 Minutes
Finisher-AF1/Saddle Finisher-AF2
11.5 Minutes
Punch Unit-BB1
11 Minutes
Booklet Trimmer-D1
28 Minutes
Booklet Trimmer-A1 (When attached to the Booklet Trimmer)
11 Minutes
Two-Knife Booklet Trimmer-A1 (When the Booklet Trimmer is not
attached)
9 Minutes
Additional Memory Type C (512 MB)
6.5 Minutes
System Upgrade RAM-B1
6.5 Minutes
Voice Guidance Kit-E1
18.5 Minutes
PCI Bus Expansion Kit
9 Minutes
IPSec Board
10.5 Minutes
Card Reader-C1
19.5 Minutes
Removable HDD Kit
21.5 Minutes
HDD Data Encryption Kit-B7 (Color Image Reader-L1 installed)
12.5 Minutes
HDD Data Encryption Kit-B7 (Color Image Reader-L1 not installed)
11 Minutes
imagePRESS Server J200/J100
1.5 Minutes
8.2 Customer Responsibilities
Item
Comment
Identify location for equipment.
Area meets space and service space requirements.
Verify strength of floor and level.
Certified by structural engineers.
Ensure that the equipment can be
delivered to the site.
Path is clear and unobstructed.
Confirm proper electrical outlets and
power are available.
Dedicated power, and enough outlets for equipment
(including accessories).
Area meets environmental
specifications.
Temperature and humidity are within specifications,
venting provided if necessary.
Network connections available.
If desired.