background image

Contents

Contents

3.1 Unpacking and Chacking the Components ........................................................................................................ 3-1

3.1.1 Checking the Contents................................................................................................................................. 3-1

3.2 Preparation Before Installation........................................................................................................................... 3-2

3.2.1 Before Starting the Work ............................................................................................................................ 3-2

3.3 Installation Procedure......................................................................................................................................... 3-3

3.3.1 Installation Procedure .................................................................................................................................. 3-3

Содержание Cassette Heater Unit 27

Страница 1: ...Mar 22 2004 Service Manual Heater Cassette Heater Unit 27 ...

Страница 2: ... need arises In the event of major changes in the contents of this manual over a long or short period Canon will issue a new edition of this manual The following paragraph does not apply to any countries where such provisions are inconsistent with local law Trademarks The product names and company names used in this manual are the registered trademarks of the individual companies Copyright This ma...

Страница 3: ...quiring care to avoid combustion fire Indicates an item prohibiting disassembly to avoid electric shocks or problems Indicates an item requiring disconnection of the power plug from the electric outlet Indicates an item intended to provide notes assisting the understanding of the topic in question Indicates an item of reference assisting the understanding of the topic in question Provides a descri...

Страница 4: ...sed to indicate Low The voltage value however differs from circuit to circuit In addition the asterisk as in DRMD indicates that the DRMD signal goes on when 0 In practically all cases the internal mechanisms of a microprocessor cannot be checked in the field Therefore the operations of the microprocessors used in the machines are not discussed they are explained in terms of from sensors to the in...

Страница 5: ... 2 1 2 1 1Basic Sequence of Operation 2 1 2 2 Power Supply 2 2 2 2 1Route of Power Supply 2 2 Chapter 3 Installation 3 1 Unpacking and Chacking the Components 3 1 3 1 1Checking the Contents 3 1 3 2 Preparation Before Installation 3 2 3 2 1Before Starting the Work 3 2 3 3 Installation Procedure 3 3 3 3 1Installation Procedure 3 3 ...

Страница 6: ...Chapter 1 Specifications ...

Страница 7: ...Contents Contents 1 1 Names of Parts 1 1 1 1 1 Names of Parts 1 1 ...

Страница 8: ...Chapter 1 1 1 1 1 Names of Parts 1 1 1 Names of Parts 0003 9450 F 1 1 1 Inside the machine 2 Cassette Heater 27 3 AC driver PCB J1806 2 1 Inside the machine 3 ...

Страница 9: ...Chapter 2 Functions ...

Страница 10: ...Contents Contents 2 1 Basic Operation 2 1 2 1 1 Basic Sequence of Operation 2 1 2 2 Power Supply 2 2 2 2 1 Route of Power Supply 2 2 ...

Страница 11: ...ich the heater may remain ON as long as the main switch and the cassette heater switch are ON regardless of the state of the environment switch Mode Main power OFF Sleep Low power Standby Warm up Recovery Printing Main power OFF ON Cassette heater SW OF F ON OF F ON OF F ON OF F ON OF F ON Heater OF F ON OF F ON OF F ON OF F ON OF F OF F 1 Mode Main power OFF Sleep Low power Standby Warm up Recove...

Страница 12: ... 2 2 2 Power Supply 2 2 1 Route of Power Supply 0004 6604 F 2 1 Leakage breaker Switch PCB AC driver PCB Main DC power supply CB1 Cassette heater H7 OFF ON OFF ON 13VA RL1 Environment switch Cassette heater switch ...

Страница 13: ...Chapter 3 Installation ...

Страница 14: ...s 3 1 Unpacking and Chacking the Components 3 1 3 1 1 Checking the Contents 3 1 3 2 Preparation Before Installation 3 2 3 2 1 Before Starting the Work 3 2 3 3 Installation Procedure 3 3 3 3 1 Installation Procedure 3 3 ...

Страница 15: ...Chapter 3 3 1 3 1 Unpacking and Chacking the Components 3 1 1 Checking the Contents 0003 9671 1 Cassette heater 1 pc 230V FM2 0564 000 2 RS tightening screw M4x10 2 pc XB3 6401 005 ...

Страница 16: ...re Starting the Work 0003 9672 Before starting the work be sure to go through the following on the host machine 1 turn off the control panel power switch 2 turn off the main power switch 3 disconnect the power cable for the wall outlet F 3 1 ON OFF 1 2 OFF OFF 3 ...

Страница 17: ...the left deck then remove the 4 screws 1 and take out the left deck compartment F 3 2 2 Slide out the right deck then remove the 4 screws 1 and detach the right deck compartment F 3 3 3 Detach the cassette 3 from the machine 4 Remove the screw 2 and detach the harness cover 1 F 3 4 1 1 1 1 1 2 ...

Страница 18: ...ion A of the cassette heater into the other slot 4 F 3 5 F 3 6 6 Secure the cassette heater in place using 2 screws 1 F 3 7 7 Connect the cassettes heater harness 1 F 3 8 8 Cut off the 4 segments of the harness cover you removed in step 4 using nippers F 3 9 1 2 3 3 1 1 A ...

Страница 19: ...ount the harness cover 1 to the machine using a screw 2 F 3 10 10 Fit the cassette 3 right deck compartment and left deck compartment back in the machine 11 Turn on the machine s environment switch and heater switch 1 2 ...

Страница 20: ...Chapter 3 3 6 ...

Страница 21: ...Mar 22 2004 ...

Страница 22: ......

Отзывы: