background image

9171 Installation Guide

Proprietary & Confidential

Canoga Perkins Metro Ethernet Routing Switch

Page 14 of 26

When there is no grounding bar in the installation environment of Ethernet switches and grounding electrodes
are not permitted to bury according to the conditions, if Ethernet switches are supplied with AC power, they
can be grounded through PE cables of AC power. At this point, PE cables of AC power should be confirmed
well grounded in the power distribution room or on AC supply transformer side.

Fig. 2-7: Grounding Installation Sketch Using AC PE Cable

Description:

(1) Power input of switch

(2) Ground terminal of switch

(3) Power transformer

(4) PE

(5) 3-core cable used in AC power connection

(6) Switch

2.3.3 Post-Installation Checking

Check if selected power agrees with the identified power of switch:

Check if the ground wire is connected.

Check if the connections between configured cables and power input cables are correct.

Check the interface cables are arranged indoors instead of outdoors, if some cables are arranged
outdoors, check if they are connected with an AC power lightning protection strip and network port
lightning protector.

Содержание 9171

Страница 1: ...9171 Metro Ethernet Routing Switch Installation Guide...

Страница 2: ...mettant des longueurs d onde allant de 1300nm 1600nm L utilisation d instruments optiques par exemple un collimateur optique avec cet quipement peut s av rer dangereuse pour les yeux Proc der des cont...

Страница 3: ...nding Connection 12 2 3 1 AC Power Wire Connection 12 2 3 2 Grounding Connection 12 2 3 3 Post Installation Checking 14 Chapter 3 Fiber Interface Module and Cable Connection Description 15 3 1 Interfa...

Страница 4: ...rvice offered is service delivered Service Availability Monitoring SAM makes sure that the services is up and running and Performance Measuring PM makes sure the services is up to speed Conforming to...

Страница 5: ...LINK ACTIVE Status LED for Management Ethernet Interface 10 10 100 1000Base T Ethernet Interface status LED 11 100 1000Base X SFP Combo Ethernet Interface status LED Fig 1 2 Front Panel of 9171 2 1 A...

Страница 6: ...switches Switches shall work normally under correct voltage so make sure the operating voltage agrees with the voltage marked on switches To reduce the risk of electric shock do not remove its enclosu...

Страница 7: ...elerate aging process of insulation materials to greatly reduce the reliability of switches and severely affect their service life Table 2 1 Temperature Humidity Requirements 2 1 4 Cleanliness Require...

Страница 8: ...ower socket should be single phase 3 wire outlet with protective earth PE so that filter circuit on devices can effectively filter interference from electric grid Places where switches work should be...

Страница 9: ...of switches can be installed in a 19 standard rack in the following way Installation of Front Hangers Coupling with Tray Note Front hangers are only used to fix switches but unable to bear the weight...

Страница 10: ...angers on switch as shown in Fig 2 2 Fig 2 2 Installation Sketch Map of Front hangers d Place switch on the tray horizontally push it slightly into the rack along the tray and fix the other end of fro...

Страница 11: ...e handle on the front end of power module to be installed with one hand and support the bottom of power module with another hand and insert the power module by smoothly sliding along the power slot un...

Страница 12: ...of the cabinet and the other end into an AC power outlet Step 3 Turn on the power switch and check if the power indicator on front panel of the switch is bright which indicates that power connection i...

Страница 13: ...vironment of Ethernet switches if a mud field is nearby and grounding electrodes are permitted to bury angle steel or steel tube not less than 0 5 m in length may be used to directly drive into the gr...

Страница 14: ...m or on AC supply transformer side Fig 2 7 Grounding Installation Sketch Using AC PE Cable Description 1 Power input of switch 2 Ground terminal of switch 3 Power transformer 4 PE 5 3 core cable used...

Страница 15: ...unshielded twisted pair wires While the transmission of 10 Base T can use CAT 3 or CAT 4 twisted pair wires By default 10 100 1000M auto negotiation are enabled for RJ45 connectors for 9171 Series Ro...

Страница 16: ...1 TX RX 1 2 TX RX 2 3 RX TX 3 4 N A N A 4 5 N A N A 5 6 RX TX 6 7 N A N A 7 Through Cable 8 N A N A 8 Table 3 2 Definition of Ethernet RJ45 Port Cross Over Line Pin No Description Description Pin No...

Страница 17: ...witches are integrated with out of band Ethernet ports whose interfaces are 100 Base TX or 10 Base T It is recommended to use the net line included 3 1 3 Console Port Console port uses an 8 pin RJ 45...

Страница 18: ...Terminal Parameter Step 1 Turn on PC and run emulator program Windows system has its own hyper terminal Step 2 Set terminal parameters take the hyper terminal setting of Windows XP as an example Param...

Страница 19: ...switch is powered on and starts up self check information on equipment will display on the terminal Users are prompted to type Enter after self check then command line DOS prompts such as CanogaPerki...

Страница 20: ...o stop autoboot 3 0 Press Ctrl B to enter uBoot operation mode b Identify a PC as loading server connect the administration port of switch and the PC with net line set IP address of the PC and adminis...

Страница 21: ...9171 r bin flash boot CanogaOS v1 2 5 fcs1 9171 r bin When copying check if the switch has enough space if the space is not enough you can delete redundant mirror b Set the mirror that will be loaded...

Страница 22: ...witch Page 22 of 26 Create Time Version File name 2008 01 23 10 53 43 9171 1 2 4 beta3 CanogaOS v1 2 4 beta3 9171 r bin 2008 01 27 10 08 38 9171 1 2 5 fcs1 CanogaOS v1 2 5 fcs1 9171 r bin d Among them...

Страница 23: ...lost or forgotten the following method can be used to reset password Enter uBoot operation mode see Chapter 5 for how to enter Input boot_flash_nopass command to start system in uBoot mode Note After...

Страница 24: ...on cable is faulty or the parameter setting of terminal such as super terminal are incorrect please check accordingly Troubleshooting for the terminal displaying hashes If the configuration terminal d...

Страница 25: ...9171 Installation Guide Proprietary Confidential Canoga Perkins Metro Ethernet Routing Switch Page 25 of 26...

Страница 26: ...nfidential Canoga Perkins Metro Ethernet Routing Switch Page 26 of 26 CANOGA PERKINS CORPORATION 20600 Prairie Street Chatsworth California 91311 6008 USA Phone 818 718 6300 FAX 818 718 6312 Web Site...

Отзывы: