![Cannon TE-BBR Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/cannon/te-bbr/te-bbr_instruction-and-operation-manual_493056024.webp)
CANNON Instrument Company | System Components Arrangement
13
Figure 6: Stirring Bar
Load Frame
Place the Load Frame into the bath of the Control Unit by lowering the Load Frame through the
larger opening in the stainless steel plate until the horizontal support member rests on the upper
surface of the Control Unit. Slide the Load Frame toward the rear of the Control Unit into the
smaller rectangular opening. When this unit is back as far as it will go, the metal cover for the
forward rectangular aperture should fit easily in the remaining space.
Level the Instrument
After the Load Frame is in the bath, place the small bubble level on the Load Frame platform to the
left of the shaft (this is where the gage block is normally placed). Adjust the four leveling legs on the
Control Unit until the bubble level indicates that the unit is level. Refer to Figure 7.
Figure 7: Bubble Level for Load Frame
Computer
Locate the computer adjacent to the control unit to expedite convenient serial connections.
Содержание TE-BBR
Страница 1: ...Instruction Operation Manual 44 0991 Thermo Electric Bending Beam Rheometer TE BBR ...
Страница 2: ......
Страница 10: ......
Страница 11: ......
Страница 44: ...CANNON Instrument Company Software Menu Options 33 Figure 17 Toolbar Options ...
Страница 47: ...36 TE BBR Instruction and Operation Manual Figure 18 Mold Specimen Diagram ...
Страница 70: ...CANNON Instrument Company Troubleshooting 59 Figure 25 Diagram A new Figure 26 Diagram B old ...
Страница 85: ...74 TE BBR Instruction and Operation Manual Figure 31 Graph View ...