![Cannon TE-BBR Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/cannon/te-bbr/te-bbr_instruction-and-operation-manual_493056014.webp)
CANNON Instrument Company | Introduction
3
Figure 3: Front of Load Frame
Manual Operation
The Load Frame can be operated both manually (LOCAL) and automatically (REMOTE) as shown in
Figure 4.
Figure 4: Front of Control Unit with Local and Remote Mode
The normal test procedure involves elements of both. Manual operation is used to adjust the
position of the loading shaft to bring it into contact with the asphalt beam and adjust the load to be
applied to the beam.
Automatic Operation
Automatic operation is controlled via the computer. The computer sends signals to the electronics
system to trigger a solenoid valve which regulates the flow of pressurized air (or gas). This adjusts
the net load applied to the asphalt beam. Refer to Figure 4.
Air/Water Heat Exchanger
The Air/Water Heat Exchanger consists of a radiator, fan(s), and a water pump to circulate and cool
a mixture of water and ethylene glycol flowing through the hot side heat sinks surrounding the bath
in the Control Unit. Circulation of the mixture removes heat from the Control Unit bath.
Содержание TE-BBR
Страница 1: ...Instruction Operation Manual 44 0991 Thermo Electric Bending Beam Rheometer TE BBR ...
Страница 2: ......
Страница 10: ......
Страница 11: ......
Страница 44: ...CANNON Instrument Company Software Menu Options 33 Figure 17 Toolbar Options ...
Страница 47: ...36 TE BBR Instruction and Operation Manual Figure 18 Mold Specimen Diagram ...
Страница 70: ...CANNON Instrument Company Troubleshooting 59 Figure 25 Diagram A new Figure 26 Diagram B old ...
Страница 85: ...74 TE BBR Instruction and Operation Manual Figure 31 Graph View ...