INSTALLATION AND OPERATIONAL CHECKS
After installation, check for gas soundness. The supply pressure can be checked at the
grill injector. Access to the injector is by first removing the baffle at the front of the grill
fastened by two screws. Then remove the fastening screw on the right hand side of the
burner and slide the burner off the injector. Ensure that the grill burner is correctly
located under the fixing screw on reassembly.
Fit the hotplate burner caps and bodies, pan supports and shelf shield(s). Referring to
the instructions for use where necessary;
1.
Check that the hotplate and grill burners ignite correctly and burn with a steady
flame. Check for a steady flame on the low setting.
2.
Check that with the main oven set to 240
o
C, the oven fan operates and the oven
heats up.
3.
Check that with the top oven set to mark 8, the burner ignites at low rate, and
then increases to full rate within 60 seconds. Leave the oven full on with the door
closed for 10 minutes, and check that when the control is turned to mark 1 that
the flame reduces.
4.
Check the operation of the oven timer and oven light(s).
Instruct the user on operation of the cooker.
NOTE: It is normal for a slight resistance to be felt when turning the Top Oven/Grill
control to the oven settings, as the control operates a flap at the rear of the cooker.
INSTALLATION INSTRUCTIONS
34
Our policy is one of continual improvement in design and development, therefore
strict accuracy of illustrations and descriptions cannot be guaranteed.
This appliance conforms to the following EEC Directives:
Gas Appliances
90/396/EEC
93/68/EEC
Low Voltage Equipment
72/23/EEC
93/68/EEC
Electromagnetic Compatibility
89/336/EEC
92/31/EEC
93/68/EEC
Содержание HARMONY Mk2
Страница 35: ......