STUD
STUD
C.L. OF
HEATER
345 mm TO 610 mm
FLUE OPENING
GAS INLET
325 mm
246 mm
45 mm
30 mm
538 mm
FLUE
OPENING
DETAIL
METHOD A
600 mm MIN
BETWEEN TOP OF
COWL AND NEAREST
PART OF ROOF
75 mm MAIN
STUD WALL
ADJUSTMENT
STRAP
HEADER
TWIN
SKIN FLUE
TOP PLATE
FLUE SUPPORT
FLUE ADAPTER
FLASHING
FLUE CLAMP
FLUE COWL
APPROVED
TO AG604
ROOF CLADDING
100 mm DIA
FLUE PIPE
MAINTAIN 25 mm
CLEARANCE BETWEEN
FLUE AND WOODWORK
WALL CLADDING
12 mm FROM
BOTTOM OF
WALL CLADDING
TO TOP OF HEATER
MEASURE DISTANCE FROM
FLOOR TO TOP OF HEATER
FLUE OUTLET PLUS 2 mm
COWL
FIT
3 SCREWS
SMALL DIA
END WITH
SWAGE
TOP PLATE
FLUE SUPPORT
FLUE
ADAPTER
SINGLE
SKIN FLUE
Page 2.
Page 7.
FIG 6.
MOCK FIREPLACE ENCLOSURE RECOMMENDATIONS
FIG 1.
300mm MAX
2400mm MAX
550mm MAX
MAKE SURE THERE IS ADEQUATE VENTILATION IN ROOM.
The enclosure can be fabricated using any standard building
materials, providing that spacer brackets are fitted to the
heater to provide adequate clearances to combustible
materials. (see Fig 5).
The area of the cavity must not exceed our dimensions as
shown in the diagram. (see Fig 1).
If the enclosure is larger than our dimensions allow, a
separate boxed section around the heater will need to be
constructed.
The heater must sit on a solid, sealed base and the
enclosure must be sealed from any draughts and be
insulated as necessary to eliminate low temperatures.
An enclosure constructed to an existing room with a solid
floor and ceiling, and any other enclosure must have the
same characteristics of being sealed from any draughts and
suitably insulated from low temperatures. Failure to adhere to
this requirement will result in unreliable operation or failure to
operate correctly and is not covered by our warranty
conditions.
CANTEBURY WITH
RECTANGULAR FLUE
ADAPTOR FITTED