9
7.
Fully tighten the support screws (A) and then screw the anchoring
screws (B) through the relevant holes in the cooker hood. Fully tighten
the anchoring screws into the wall.
8.
Plate I and II are used to fix the chimney on the wall. Put the inner chimney on the
outer chimney. Then pull the inner chimney upwards. Install plate I on the chimney
by two screws (4mm x 8mm).
Place the chimney on the cooker hood and determine the location of plate I and II.
Drill holes to accommodate plate I & II.
Screw
(4mm x 8mm)
Plate 1
Outer chimney
Inner chimney
Содержание CCC 60BA/1
Страница 2: ...1 INSTALLATION AND USER S MANUAL CCC 60BA 1 CCC 60GH 1 CCC 60X 1 CCC 60N 1 ...
Страница 16: ...15 INSTRUKCJA INSTALACJI I OBSŁUGI CCC 60BA 1 CCC 60GH 1 CCC 60X 1 CCC 60N 1 ...
Страница 30: ...29 NÁVOD K INSTALACI A ÚDRŽBĚ CCC 60BA 1 CCC 60GH 1 CCC 60X 1 CCC 60N 1 ...
Страница 44: ...43 NAVODILA ZA MONTAŽO IN UPORABO CCC 60BA 1 CCC 60GH 1 CCC 60X 1 CCC 60N 1 ...
Страница 58: ...57 NÁVOD NA INŠTALÁCIU A POUŽITIE CCC 60BA 1 CCC 60GH 1 CCC 60X 1 CCC 60N 1 ...
Страница 72: ...71 ÜZEMBE ÁLLÍTÁS ÉS FELHASZNÁLÓI KÉZIKÖNYV CCC 60BA 1 CCC 60GH 1 CCC 60X 1 CCC 60N 1 ...
Страница 86: ...85 MANUAL DE INSTALARE ŞI UTILIZARE CCC 60BA 1 CCC 60GH 1 CCC 60X 1 CCC 60N 1 ...
Страница 100: ...99 УПЪТВАНЕ ЗА МОНТАЖ И РЪКОВОДСТВО НА ПОТРЕБИТЕЛЯ CCC 60BA 1 CCC 60GH 1 CCC 60X 1 CCC 60N 1 ...