Canature WaterGroup Aqua Flo AQUV-8R1 Скачать руководство пользователя страница 7

6

7

Lamp Spring

UV Lamp

UV UNIT

Wrench

Gland Nut

Quartz Dome

Dome O-Ring

(Thicker)

Gland Nut O-Ring

(Thinner)

Ballast Mounting

Nuts & Bolts

Ballast with lamp 

connector

Water Meter

OR

UV System

Water Heater

Cold water 

to house

Hot water 

to house

City Water

Well Water

W

at

er S

of

tener

(O

ptional

)

Pressure Tank

Well Water

Water 

Flow

Water 

Flow

OR

Water 

Flow

Water 

Flow

Unpacking the UV System

Your UV system includes the following items:

Install Location

If your water comes from a well or a lake/river etc., the UV should be installed after your pump and pressure tank. To prevent damage to the UV 

system, do not install it between well pump and pressure tank. If you have other water filters/conditioner installed, such as softener/iron filter etc., 

the UV system should always be installed as the last step of treatment before the water pipes divide into hot and cold 

(Fig 2

).

Fig. 2

Fig. 3

Fittings Required for Installation (Not Included)

Fittings required for a typical install on 3/4” copper pipe are 3/4” FNPT female adapters, 3/4” Tee, 3/4” Elbows, 3/4” copper pipe, 3/4” union 

couplings and 3/4” ball valves. You may need different fittings if your pipe size or material is different. If you are unsure of what fittings to use, 

please call Aqua Flo.

CAUTION

UV light can degrade plastics over time. If your water pipe is plastic (such as PEX), it is 

recommended that you use at least 6 to 12 inches of UV-resistant material (e.g. copper) 

on the inlet and outlet of the UV unit to prevent damage, and potential flooding.

Содержание Aqua Flo AQUV-8R1

Страница 1: ...nstalled in accordance with local plumbing codes 3 Test the water periodically to verify that the system is performing satisfactorily 4 Discard small parts remaining after the installation 5 Failure t...

Страница 2: ......

Страница 3: ...rganisms present in the water supply Simple maintenance continuous disinfection and ultimately safe water AQUA FLO makes it that easy A INTRODUCTION 4 B SAFETY GUIDELINES 4 C WATER QUALITY REQUIREMENT...

Страница 4: ...any harmful disinfection by products Fig 1 Lamp contains mercury Hg Dispose or recycle in accordance with applicable laws For information on safe handling procedures and safe disposal and recycling c...

Страница 5: ...the power outlet by holding the plug Never pull the cord To comply with the National Electrical Code and to provide additional protection from the risk of electric shock this system should only be co...

Страница 6: ...he system must be installed in accordance with all local state or provincial regulations The system requires a constant power supply of 110V AC It is strongly recommended to have a dedicated electrica...

Страница 7: ...k If you have other water filters conditioner installed such as softener iron filter etc the UV system should always be installed as the last step of treatment before the water pipes divide into hot a...

Страница 8: ...the new cartridge into the sump and screw the sump back onto the filter Hand tighten only 4 Carefully unpack UV lamp and quartz dome Two o rings come with the quartz dome The thinner o ring is instal...

Страница 9: ...ugh the plastic making it easy to hook up lamp then white plastic part has a little screw to secure it to the gland nut 11 Remove the nut from the ground stud at the top of the unit Next place the gro...

Страница 10: ...s minimal 7 You are ready to use the water now F BALLAST FOR AQUV UV SYSTEMS Aqua Flo AQUV advanced micro processor controlled electronic UV ballast is for use with Aqua Flo AQUV 8 AQUV12 AQUV 20 Syst...

Страница 11: ...rd old cartridge and rinse sump 4 Remove O rings and replace if they have been in use for a year Otherwise wipe them with a soft cloth or paper towel and clean the groove on which the O rings are seat...

Страница 12: ...l re set the lamp change timer to zero and the 3 second beep will confirm that the re set was successful Winterizing Your System To winterize the system unplug the unit first Drain the pre filter by r...

Страница 13: ...nut 2 4 430335 SS UV Chamber for AQUV 8 1 5 Gland Nut 1 6 89587 Chamber Mounting SS Nut 1 7 36003037 Quartz Dome for AQUV 8 1 8 80127302 Dome O Ring Thicker 1 9 80127301 Gland Nut O Ring Thinner insi...

Страница 14: ......

Страница 15: ......

Страница 16: ...ding any warranty of merchantability or fitness for a particular purpose and excludes all other express or implied warranties to the extent permitted by law For clarity where exclusion is not permitte...

Отзывы: