PROJECT NAME
LOCATION
NUMBER
INSTALLATION AND
COMMISSIONING CHECKLIST
Warning: This checklist is not a replacement for the user manual.
Please read the user manual prior to inverter site selection and installation.
3 PHASE STRING INVERTERS
(KTL SERIES)
C
S
IF
-S
T-
0
1
6 A
/0
Step
No.
Content
Details
Values / Notes
Conclusion
3
Waiting time
[ ] Completed
Record LEDs status in Notes
4
Power generation
After grid connection, record power output of inverter.
[ ] Completed
Record power in Notes
5
Date & Time
setting
Set the current date and time using the front
panel interface.
[ ] Completed
Record current date/time
in Notes
6
Communication
setting (if avail.)
Set communication with a unique address for
each inverter.
[ ] Completed
Record address in Notes
7
Machine version
For maintenance and reference, please record the
irmware revisions if applicable.
[ ] Completed
Record with serial numbers
8
Operating
parameter
Record operating parameters of the inverter.
Verify IEEE1547 or UL1741 setting is selected.
De-rate inverter and attach de-rate sticker as required.
[ ] Completed
Record operating
parameters in Notes
9
Testing
Open and close the DC breaker to conirm whether the
inverter reboots and shuts down automatically.
[ ] Reboot successful
[ ] Not rebooting
10
Completion
Installation and commissioning is complete if
no abnormality.
[ ] Good
[ ] Issues detected
C
O
M
M
IS
S
IO
N
IN
G
Please return completed form to inverter.register@
csisolar.com
www.csisolar.com
After 6
0-
3
0
0 seconds (depending on local requirement), the
inverter will start to generate power
.
The green LED will be on continuously and the LCD displays
the information of GENERATING
.