11 Daily Maintenance 

 

DANGER 

Risk of inverter damage or personal injury due to incorrect service! 

Always keep in mind that the inverter is powered by dual sources: PV array and utility grid.   

Before any service work, observe the following procedure.   

1) Disconnect the inverter from the utility grid side first and then PV array;   

2) Wait at least 5 minutes after shun down the inverter, for inner capacitors to discharge 

completely;   

3) Verify that no voltage and current existing with appropriate testing devices. 

 

CAUTION 

Keep non-related persons away! 

A temporary warning sign or barrier must be posted to keep non-related persons away while 

performing electrical connection and service work.

 

 

NOTICE 

Risk of inverter damage if it is improperly serviced.   

Use accessories and spare parts approved by the inverter manufacturer only. Never modify the 

inverter or other components of the inverter. The loss of any or all warranty rights may follow if 

otherwise.

 

 

NOTICE 

Any malfunction that may impair the inverter safety operation must be repaired immediately before 

the inverter is restarted.   

Inverter contains no customer serviceable parts inside. Please contact local authorized personnel if 

any service work is required. 

 

 
 
 

Information 

Servicing of the device in accordance with the manual should never be undertaken in the absence 

of proper tools, test equipments or the more recent revision of the manual with has been clearly 

and thoroughly understood. 

 

 

12 Trouble Shooting 

When the inverter does not operate normally, we recommend the following actions for quick troubleshooting. Please 
review the error list table carefully.   
 

12.1 Warning 

The different LED colors and flashing status identify the current operation statuses of the inverter. If the red color is 
always on, it indicates the inverter fault. Usually the warnings can be cleared through an orderly shutdown / reset or a 
self-corrective action performed by the inverter. 
 

12.2 Errors 

Error codes identify a possible equipment fault, or incorrect setting/ configuration. Any and all attempts to correct or 
clear a fault must be performed by qualified personnel. Typically, the Errors code can be cleared once the cause or fault 
is removed.   
However, some of the (E) codes may cannot be cleared, in this case please contact the dealer or CSI Solar Co., Ltd. to 
replace a new one.   
Errors as indicated in the table below:   

Error 
Code 

Error Message 

Suggestion 

F-100  Over temperature 

1. Check heatsink for obstructions/ventilation. 
2. Check the ambient temperature around the inverter. 

Items 

Methods 

Period 

System 

clean 

Check the temperature and dust of the inverter. Clean the inverter enclosure.   

Check the humidity and dust of the environment.   

Meanwhile check whether the filter function of the air inlet is ok. 

Six months to a year (it 

depends on the dust 

contents in air.) 

 

Содержание CSI-5K-S22003-E

Страница 1: ...CSI 3K S22002 E CSI 5K S22002 E CSI 5K S22003 E PV Inverter User Manual Part No 2809001703 Release Date July 2022...

Страница 2: ..._______________________________________________________________________ 4 4 Storage_______________________________________________________________________________________5 5 Unpackaging and Inspection...

Страница 3: ...______________________________ 19 1 Scope_______________________________________________________________________________________________ 19 2 CT Specification__________________________________________...

Страница 4: ...s and documents published on our website at http www csisolar com as these lists are updated on a regular basis 1 3 Limitation of Liability CSI Solar Co Ltd shall not be held responsible for damages o...

Страница 5: ...he safety specification about the electrical system 3 Be familiar with the local requirements rules and regulations 4 Understand the composition and working principles of the grid tied PV system 2 2 2...

Страница 6: ...grid connected system mainly includes PV modules DC switch inverter AC switch electricity meter and local grid The PV power system diagram is shown as FIG 3 1 KWH PV Modules DC Switch Inverter AC Swi...

Страница 7: ...Input Current 15 15 A dc Max Short Circuit Current 18 8 18 8 A dc Rated Output Power 5000W AC Nominal Voltage 220 240V ac AC Nominal Frequency 50 60Hz Max Output Current 25A ac Power Factor 0 99 0 8...

Страница 8: ...nt is missing contact local dealer Note For details information about the components see the packing list document in the packing case 6 Installation 6 1 Basic Installation Requirements 1 Do not insta...

Страница 9: ...dissipation and to ensure that no moisture can penetrate the product 15 FIG 6 5 Installation Angle Requirements 13 Do not install the inverter outdoors in salt sulfur or other corrosive areas The inve...

Страница 10: ...nsion anchors into the corresponding four holes and then secure the bracket by using screws as per FIG 6 7 FIG 6 8 FIG 6 7 Install Expansion Anchors FIG 6 8 Fix Wall mounting Bracket 6 3 Installing In...

Страница 11: ...r CT Connection Optional The inverter has integrated export limitation functionality To use this function a power meter or a CT must be installed For installation and operation methods see ANNEX C D f...

Страница 12: ...n 0 9 leading to 0 9 lagging meanwhile need external SPI Install an independent two pole circuit breaker at the output side of the inverter for protection the recommended AC circuit breaker specificat...

Страница 13: ...river to fix conductors firmly EXCEEDCONN type Torque 0 8N m PE L N L N PE A A A A DEVALAN type Torque 1 4N m L N PE B B B B N PE L FIG 7 5 AC Terminal Positions 3 Push the threaded sleeve into the pl...

Страница 14: ...the insulation from each DC cable by 7mm Step 2 Assemble the cable ends with the crimping pliers Step 3 Lead the cable through cable gland and insert into the insulator until it snaps into place Gentl...

Страница 15: ...n perform the wiring work 8 Communication 8 1 Communication Mode Multi communication patterns for option RS485 Built in module GPRS and WIFI with the communication port M16 8 2 External WiFi More deta...

Страница 16: ...f the PV strings is greater than the Min DC input voltage but is lower than the DC start up input voltage Inverter cannot start up normally and cannot feed power into utility grid either 2 Checking Co...

Страница 17: ...dertaken in the absence of proper tools test equipments or the more recent revision of the manual with has been clearly and thoroughly understood 12 Trouble Shooting When the inverter does not operate...

Страница 18: ...check the grid layout 3 Consistent connect the AC connector turn on DC Switch inverter will restore the grid connection automatically 4 If error message still exists contact Customer service F 107 DC...

Страница 19: ...section 10 and section 11 2 Remove all the connection cables from the inverter 3 Unscrew the fixing screws on both sides of the inverter 4 Remove the inverter from the bracket Note Before performing...

Страница 20: ...evice DRM demand response mode LED light emitting diode MPPT maximum power point tracking PC personal computer PE protecting earthing PV photovoltaic RCD residual current protective device RCM residua...

Страница 21: ...ection DC Switch Integrated Anti Islanding Protection Integrated DC Reverse Protection Integrated Insulation Monitoring Integrated AC Over Voltage Protection Integrated AC Over Current Protection Inte...

Страница 22: ...al P1 and red cable Dimension W x H x D mm 30 5 X 49 X 34 mm Signal cable length 5 m not including CT sensor FIG 1 Outline and Dimensions of CT 3 CT installation 3 1 System diagram L N PE L N PE CT CT...

Страница 23: ...The current direction muse be consistent with the arrow direction on the shell of CT 3 Fix the CT with cable tie to prevent slipping as per FIG 9 4 Check the current and current direction turn on pow...

Страница 24: ...tallation Method Rail DIN 35mm FIG 1 Outline and Dimensions of Meter 3 Meter installation 3 1 System diagram Note The meter has to be installed to the grid side L L N N 5 6 7 8 L N PE L N PE L N PE Lo...

Страница 25: ...r manual Tools Phillips screwdriver 2 Torque 1 2 1 6N m 3 4 Setting on the inverter default setting is OFF 1 Enter CSI CloudPro APP 2 Enter the Local Mode as per FIG 8 3 Scan the QR code of WiFi stick...

Страница 26: ...Install the App Method 1 Scan the following QR Code to download and install the App according to the prompt information Method 2 Download and install the App through the following application stores G...

Страница 27: ...24 25 Step 1 Open the CSI CloudPro APP Step 2 Select Local Mode then scan logger SN The mobile phone will connect to the collector automatically...

Страница 28: ...onnection succeeds users can view the real time operating data of the inverter Step 4 Select Params enter the password 000000 and login the system Then users can view and modify parameters APP picture...

Страница 29: ...Jiangsu China 215129 Sales Inquiries Email info csisolar com Customer Support Email service ca csisolar com This manual is subject to change without prior notification Copyright is reserved Duplicati...

Отзывы: