background image

| 3

All the basic requirements of the main aluminum 
frame Dymond installation manual should also apply to 
alternative mounting methods, unless otherwise specified.

The loads described in this manual correspond to test 
loads. For installations complying with IEC 61215-2:2016 
and UL 1703, a safety factor of 1.5 should be applied for 
calculating the equivalent maximum authorized design 
loads. Project design loads depend on construction, 
applicable standards, location and local climate. 
Determination of the design loads is the responsibility 
of the racking suppliers or professional engineers. For 
detailed information, please follow local structural code or 
contact your professional structural engineer.

ClampIng methoDs

·  The mounting method has been qualified by Canadian 

Solar Inc. as well as certified by VDE and CSA.

·  Each module must be securely fastened at a minimum 

of four points on two opposite sides. The clamps should 
be positioned symmetrically. The clamps should be 
positioned according to the authorized position ranges 
defined in table A. Install and tighten the module clamps 
to the mounting rails using the torque stated by the 
mounting hardware manufacturer. M8 X 1.25 (5/16”) 
bolt and nut are used for this clamping method. The 
yield strength of bolt and nut should not be less than 
450 MPa.

·  Tightening torques should be within 17~23 Nm 

(12.5~17.0 ft-lbs) for M8 (5/16”-18 Grade B7) coarse 
thread bolts, depending on the bolt class. For 
the bolt grade, the technical guideline from the 
fastener suppliers should be followed. Different 
recommendations from specific clamping hardware 
suppliers should prevail. 

·  The system designer and installer are responsible for 

load calculations and for proper design of support 
structure. 

·  Canadian Solar Inc.’s warranty may be void in cases 

where improper clamps or unsuitable installation 
methods are found. When installing inter-modules or 
end-type clamps, the clamps must:

       Not  bend the module frame
       Not  touch or cast shadows on the front glass
       Not  damage the surface of the frame (to the  
       exception of the clamps with bonding pins)
       Ensure to  overlap the module frame by at least 5 mm  

       (0.2 in)
       Ensure to  overlap in length by at least 80 mm (3.15 

in). when uplift load ≤ 4000 Pa, 40 mm (1.57 in) when 
uplift load ≤ 2400 Pa. 

       Ensure to have a  thickness of  at least 3 mm (0.12 in)

·  Clamp material should be anodized aluminum alloy or 

stainless steel.

·  Clamp positions are of crucial importance for the 

reliability of the installation. The clamp centerlines must 
only be positioned within the ranges indicated in table A, 
depending on the configuration and load. 

annex a: alteRnatIve mountIng methoDs

6

Min. 5 mm 
overlap

Min. 3 mm thickness

Min. overlap length 
40 mm

Содержание CS3K-250P-AG

Страница 1: ...1 INSTALLATION MANUAL OF ALUMINUM FRAME DYMOND MODULE For professional use only...

Страница 2: ...LIABILITY 2 0 SAFETY PRECAUTIONS 3 0 MECHANICAL ELECTRICAL SPECIFICATIONS 4 0 UNPACKING AND STORAGE 5 0 MODULE INSTALLATION 5 1 MODULE WIRING 5 2 GROUNDING 6 0 MOUNTING INSTRUCTIONS 6 1 MOUNTING METH...

Страница 3: ...m installation or compliance or non compliance with the instructions set forth in this manual 2 0 SAFETY PRECAUTIONS WARNING Before attempting to install wire operate and or service the module and oth...

Страница 4: ...odules can be excluded However a release of and exposure to lead can take place i when the different components of the solar modules are disas sembled in particular for recycling purposes and ii in in...

Страница 5: ...ND STORAGE PRECAUTIONS Module should be stored in a dry and ventilated environment to avoid direct sunlight and moisture If modules are stored in an uncontrolled environment the storage time should be...

Страница 6: ...ease refer to the datasheet or the product nameplate for the detailed types Consult your local authority for guidelines and requirements for building or structural fire safety UL 1703 SYSTEM FIRE RATI...

Страница 7: ...e wiring when designing the system The recommended maximum series fuse rating is stated in a table in the Annex Modules should be safely fixed to bear all expected loads including wind and snow loads...

Страница 8: ...the racking system Do not place connectors in locations where water could easily accumulate 5 2 GROUNDING For grounding requirements in North America a module with exposed conductive parts is consider...

Страница 9: ...ard modules can be installed in either landscape or portrait orientations Refer to the detailed instructions for further guidance Please note that in areas with he avy snowfall 2400 Pa further counter...

Страница 10: ...effect If the module has become soiled wash with water and a non abrasive cleaning implement sponge during the cool part of the day Do not scrape or rub dry dirt away as this may cause micro scratche...

Страница 11: ...1 Installation manual Annex of ALUMINUM FRAME DYmond Module For professional use only...

Страница 12: ...on contained in this manual is subject to change by Canadian Solar Inc without prior notice Canadian Solar Inc gives no warranty of any kind whatsoever either explicitly or implicitly with respect to...

Страница 13: ...yield strength of bolt and nut should not be less than 450 MPa Tightening torques should be within 17 23 Nm 12 5 17 0 ft lbs for M8 5 16 18 Grade B7 coarse thread bolts depending on the bolt class For...

Страница 14: ...0 Pa A1 range 270 380 mm Maximum Load Uplift load 4000 Pa Downforce load 8100 Pa A1 A1 A1 A1 A1 range 240 550 mm Maximum Load Uplift load 3600 Pa Downforce load 3600 Pa A2 A2 A2 A2 Table A CS6K P AG C...

Страница 15: ...rtment for details in regard to specific projects Canadian Solar modules can be grounded using third party grounding devices as described below The grounding methods are certified by CSA according to...

Страница 16: ...4 CS6K 290P AG 290 31 6 9 18 38 5 9 72 CS6K 295P AG 295 31 8 9 28 38 6 9 81 CS6K 300P AG 300 32 0 9 38 38 8 9 92 CS6K 250MS AG 250 30 5 8 2 37 7 9 03 15 1658 992 35 65 3 39 1 1 38 in 21 7 47 8 lbs CS6...

Страница 17: ...5 39 8 9 18 47 2 9 75 CS3U 370P AG 370 40 0 9 26 47 4 9 83 CS3K 280MS AG 280 31 7 8 84 38 5 9 49 30 1675 992 35 65 9 39 1 1 38 in 22 5 49 6 lbs CS3K 285MS AG 285 31 9 8 94 38 7 9 57 CS3K 290MS AG 290...

Страница 18: ...ipment Do not use abrasive or electric cleaners on the module Particular attention should be taken to avoid the module glass or frame to come in contact with sharp objects as scratches may directly af...

Страница 19: ...9 Rev A0 is released in October 2017 Rev A1 is released in February 2018 AMENDED EDITIONS AND DATES Canadian Solar Inc 545 Speedvale Avenue West Guelph Ontario Canada N1K 1E6 www canadiansolar com...

Отзывы: