CORRECT WIRING SCHEME 

 

·  Ensure that the wiring is correct before starting up the 

system. If the measured open circuit voltage (Voc) and 
short-circuit current (Isc) differ from the specifications, 
this indicates that there is a wiring fault.  

 

CORRECT CONNECTION OF PLUG CONNECTORS

  

·  Make sure that connections are safe and tight. 

Plug connector should not be subjected to stress 
from the exterior. Connectors should only be  
used to connect the circuit. They should never  
be used to turn the circuit on and off.  

USE OF SUITABLE MATERIALS  

·  Only use dedicated solar cable and suitable plugs 

(wiring should be sheathed in a sunlight-resistant 
conduit or, if exposed, should itself be sunlight- 
resistant) that meet local fire, building and electrical 
regulations. Please ensure that all wiring is in  
perfect electrical and mechanical condition.  

·  Installers may only use 2.5-10 mm

2

 (8-14 AWG) 

single conductor cable listed and labeled as PV Wire 
or TUV 2PfG1169 approved, that is 90°C wet rated 
with proper insulation that is able to withstand the 
maximum possible system open-circuit voltage. 
Only copper conductor material should be used. 
Select a suitable conductor gauge to minimize 
voltage drop and ensure that the conductor 
ampacity complies with local regulations (i.e. NEC 
690.8(D)).

CABLE PROTECTION 

 

·  Secure the cables to the mounting system using 

UV-resistant cable ties. Protect exposed cables 
from damage by taking appropriate precautions 
(e.g. placing them inside a plastic conduit). Avoid 
exposure to direct sunlight.

·  A minimum bending radius of 60 mm is required 

when securing the junction box cables to the  
racking system.

CONNECTOR PROTECTION 

 

·  Protect exposed connectors from weathering 

damage by taking appropriate precautions. 
Avoid exposure to direct sunlight.

5.2 

MODULE GROUNDING

·  EQUIPMENT GROUNDING: double glass modules 

do not present any exposed conductive parts, and 
therefore do not require to be electrically groun-
ded for compliance to the National Electrical Code.

·  Proper equipment grounding is still required for 

the racking system in compliance with all local 
electrical codes and regulations. Please refer to the 
racking system user instructions.

6.0  

MOUNTING INSTRUCTIONS

STANDARD MODULES

For a clear understanding of our modules, please

refer to the illustration of a module shown below:

The applicable regulations pertaining 
to work safety, accident prevention and 
securing the construction site must be 
observed. Workers and third party

personnel shall wear or install fall arrest equipment. 
Any third party need to be protected against injuries 
and damages.

·  The mounting design must be certified by a regis-

tered professional engineer. The mounting design 
and procedures must comply with local codes and 
requirements from all relevant authorities.

·  Each module must be securely fastened at a 

minimum of 4 points on two opposite sides. 

  Junction box
  Plastic corners 

  Cables and connectors 

 

(-)

(+)

Содержание Dymond CS6K-245M-FG

Страница 1: ...INSTALLATION MANUAL OF DYMOND MODULE For professional use only ...

Страница 2: ...EN Rev IM FDM EN 1 6 Copyright March 2017 Canadian Solar Inc ...

Страница 3: ...S 3 0 MECHANICAL ELECTRICAL SPECIFICATIONS 4 0 UNPACKING AND STORAGE 5 0 MODULE INSTALLATION 5 1 MODULE WIRING 5 2 MODULE GROUNDING 6 0 MOUNTING INSTRUCTIONS 7 0 MAINTENANCE AMENDED EDITIONS AND DATES ANNEX A MECHANICAL AND ELECTRICAL RATINGS ANNEX B DOUBLE GLASS MODULE INSTALLATION MANUEL SUPPLEMENT 4 4 4 4 5 8 5 8 6 9 7 10 10 12 ...

Страница 4: ...ing without limitation bodily harm injury or damage to property in connection with handling PV modules system installation or compliance or non compliance with the instructions set forth in this manual 2 0 SAFETY PRECAUTIONS Warning Before attempting to install wire operate and or service the module and other electrical equipment all inst ructions should be read and understood PV module interconne...

Страница 5: ...trical Ratings Main electrical charac teristics under STC are also stated on each module label The maximum system voltage for double glass module type is 1000V UL and 1500V IEC Under certain conditions a module may produce more current or voltage than its STC rated power As a result a module open circuit voltage and short circuit current under STC should be multiplied by 1 25 when determining comp...

Страница 6: ...d heavy loads may cause severe micro cracks at cell level which in turn may compromise module reliability Failure to comply with the above caution will void Canadian Solar Inc s warranty SYSTEM FIRE RATING The fire rating for this module is only valid when the product is installed as specified in the mechani cal mounting instructions Canadian Solar Inc double glass modules have been certified by C...

Страница 7: ...ring Only modules with similar electrical outputs should be connected in the same series to avoid or minimize mismatch effects in arrays To minimize risk in the event of an indirect light ning strike avoid forming loops when designing the system The recommended maximum series fuse rating is stated in a table in the Annex Modules should be safely fixed to bear all expected loads including wind and ...

Страница 8: ...nting system using UV resistant cable ties Protect exposed cables from damage by taking appropriate precautions e g placing them inside a plastic conduit Avoid exposure to direct sunlight A minimum bending radius of 60 mm is required when securing the junction box cables to the racking system CONNECTOR PROTECTION Protect exposed connectors from weathering damage by taking appropriate precautions A...

Страница 9: ...s overlap the module by 13 mm to 15 mm 5 To ensure the thickness of the clamps is at least 3 mm Clamp positions are of crucial importance for the reliability of the installation the clamp centerline must only be positioned within the authorized position ranges indicated in ANNEX B depending on the configuration and load The module is only considered to comply with UL1703 when mounted as specified ...

Страница 10: ...38 8 9 92 CS6K 245M FG 245 30 3 8 09 37 4 8 61 15 1658ˣ 992 ˣ 5 8 65 3 ˣ 39 1 ˣ 0 23 in without junction box and corner protector 23 CS6K 250M FG 250 30 4 8 22 37 5 8 74 CS6K 255M FG 255 30 5 8 35 37 7 8 87 CS6K 260M FG 260 30 7 8 48 37 8 8 99 CS6K 265M FG 265 30 9 8 61 37 9 9 11 CS6K 270M FG 270 31 1 8 67 38 2 9 19 CS6K 275M FG 275 31 3 8 80 38 3 9 31 cleaning effect If the module has become soil...

Страница 11: ...5 32 7 9 33 39 9 9 91 CS6K 310MS FG 310 32 9 9 43 40 1 9 99 CS6X 290P FG 290 35 9 8 08 44 4 8 64 15 1968ˣ 992 ˣ 5 8mm 77 5ˣ 39 1 ˣ 0 23 in without junction box and corner protector 27 5 CS6X 295P FG 295 36 0 8 19 44 5 8 76 CS6X 300P FG 300 36 1 8 30 44 6 8 87 CS6X 305P FG 305 36 3 8 41 44 8 8 97 CS6X 310P FG 310 36 4 8 52 44 9 9 08 CS6X 315P FG 315 36 6 8 61 45 1 9 18 CS6X 320P FG 320 36 8 8 69 45...

Страница 12: ...A A Clamping on module long side four clamp points Mounting rails must run perpendicularly to the module long side Clamping Location Illustration Illustration A Clamping on module long side six clamp points Mounting rails must run perpendicularly to the module long side Illustration B A A A A B B B The following clamps in table 2 have been approved as compatible with Canadian Solar double glass mo...

Страница 13: ...amp length 100 mm four clamps A 380 20 mm see illustration A Downforce load 2400 Pa Uplift load 2400 Pa VDE CSA 2 C 2 Profi clamp wide 3 8 mm clamp length 200 mm four clamps A 380 20 mm see illustration A Downforce load 5400 Pa Uplift load 2400 Pa VDE CSA 2 C 3 Profi clamp wide 3 8 mm clamp length 80 mm six clamps A 250 20 mm B 579 20 mm see illustration B Downforce load 2400 Pa Uplift load 2400 P...

Страница 14: ...ength 100 mm six clamps A 250 20 mm B 579 20 smm see illustration B Downforce load 5400 Pa Uplift load 2400 Pa VDE CSA 2 F 1 Akcome Metals Technology Suzhou Co Ltd AK EC DG End clamp AK MC DG Middle clamp clamp length 100 mm four clamps A 380 20 mm see illustration A Downforce load 2400 Pa Uplift load 2400 Pa VDE CSA 2 F 2 AK EC DG End clamp AK MC DG Middle clamp clamp length 200 mm four clamps A ...

Страница 15: ...fi clamp wide 3 8 mm clamp length 130 mm four clamps A 440 20 mm see illustration A Downforce load 2400 Pa Uplift load 2400 Pa VDE CSA 3 C 2 Profi clamp wide 3 8 mm clamp length 250 mm four clamps A 440 20 mm see illustration A Downforce load 5400 Pa Uplift load 2400 Pa VDE CSA 3 C 3 Profi clamp wide 3 8 mm clamp length 100 mm six clamps A 300 20mm B 684 20 mm see illustration B Downforce load 240...

Страница 16: ...01 End clamp PW CS 02 Middle clamp clamp length 100 mm six clamps A 300 20 mm B 684 20 mm see illustration B Downforce load 2400 Pa Uplift load 2400 Pa VDE CSA 3 E 4 PW CS 01 End clamp PW CS 02 Middle clamp clamp length 130 mm six clamps A 300 20 mm B 684 20 mm see illustration B Downforce load 5400 Pa Uplift load 2400 Pa VDE CSA 3 F 1 Akcome Metals Technology Suzhou Co Ltd AK EC DG End clamp AK M...

Отзывы: