background image

SC932A CS I/O to RS-232-DCE Interface 

Occasionally, a customer needs to transmit data across longer or smaller gage 

wires or at higher speeds than can be done with the RAD modem powered by 

the SC932A. RAD does sell a 9-volt power supply that will boost the signals 

enough to meet some of these more demanding applications. Please contact 

RAD for more information. 

4.3  Testing RAD Modem Communication 

The modem communication link is divided into the following three sections: 

1) RAD modem computer end, 2) cable from computer modem to datalogger

modem, and 3) RAD modem datalogger end. When unable to establish

communication with the datalogger, test each of the three sections.

Before proceeding through the testing procedures, a terminal emulator software 

program such as 

HyperTerminal

 or Campbell Scientific’s 

Terminal Emulator

 

(included with 

PC200W

PC400

, and 

LoggerNet

) must be used to communicate 

through the COM port of the computer. Once the emulator program is set up, 

testing can proceed as follows: 

1. Disconnect the four conductor cables from the SRM-6A RAD modem at

the computer end. Jumper the XMT + to RCV + and jumper the XMT – to

RCV –. This creates a transmit loop which allows any key pressed at the

computer keyboard to be seen on the screen. If the key pressed is not seen,

check the following: COM port configuration, 25-pin cable from the

computer to the modem and the RAD modem.

2. Reconnect the four conductor cables to the modem at the computer end

and disconnect the cable from the modem at the datalogger end. Twist

together the XMT + wire and RCV + wire, twist together the XMT – wire

and the RCV – wire. Repeat the process of step 1 by pressing a key on the

computer keyboard. If the key pressed is not returned, then the cable from

the modem at the computer to the datalogger modem is defective and will

need to be repaired or replaced.

3. If steps 1 and 2 pass, the modem at the datalogger is suspect. Disconnect

the modem from the SC932A and bring the modem to the computer site.

Attach the modem to the computer, and repeat step 1 by jumpering the

terminals of the modem and pressing a key on the computer keyboard.

If the above tests pass and communication to the datalogger still has not been 

established, perform tests 4, 5, and 6.  

4. A 12 V lead acid battery supply should not be discharged below 11.76 V.

If this occurs, the batteries will go into a deep discharge state and will

need to be replaced. The CR10 will function properly on a battery voltage

of 10 to 15 volts. Check the 12 V supply with a volt meter.

5. On the wiring panel of most Campbell Scientific dataloggers there is a

terminal marked 5 V. Check the 5 V supply with a volt meter. This 5 V

supply should be within a tenth of a volt. If not, it would indicate a

problem.

6. To verify that the datalogger and its serial I/O port are working, try to

access input memory locations using a laptop PC with the SC32B or the

CR10KD Keyboard Display.

If the datalogger passes tests 4, 5, and 6, then the SC932A is suspect and will 

need to be repaired or replaced. 

Содержание SC932A

Страница 1: ...INSTRUCTION MANUAL SC932A CS I O to RS 232 DCE Interface Revision 9 16 C o p y r i g h t 1 9 8 7 2 0 1 6 C a m p b e l l S c i e n t i f i c I n c...

Страница 2: ......

Страница 3: ...under guarantee or not Please state the faults as clearly as possible and if the product is out of the guarantee period it should be accompanied by a purchase order Quotations for repairs can be give...

Страница 4: ......

Страница 5: ...digital cell phones and aerials may also not be applicable according to your locality Some brackets shields and enclosure options including wiring are not sold as standard items in the European marke...

Страница 6: ......

Страница 7: ...ore beginning work Wear a hardhat and eye protection and take other appropriate safety precautions while working on or around tripods and towers Do not climb tripods or towers at any time and prohibit...

Страница 8: ......

Страница 9: ...ions 1 General Description 1 2 Specifications 2 3 Installation 3 4 RAD Modem Application 3 4 1 RAD Modem Two Way 4 4 2 RAD Modem Wiring and Grounding 4 4 3 Testing RAD Modem Communication 6 Figures 1...

Страница 10: ......

Страница 11: ...rt The SC932A will use the 5 V supply to power the RS 232 modem if needed Two way interactive communication The SC932A is frequently used with a short haul modem to communicate across a dedicated line...

Страница 12: ...l Ground 6 In DSR Data Set Ready No Connection 7 Out RTS Request to Send Modem Enable 8 In CTS Clear to Send No Connection 9 In Ring Rings Datalogger CS I O 9 Pin Male Connector Pin out Pin No I O Nam...

Страница 13: ...ed to protect the computer and datalogger in areas where damage due to lightning is possible If this is a RAD modem application see Section 4 2 RAD Modem Wiring and Grounding p 4 4 RAD Modem Applicati...

Страница 14: ...on the Connect window 4 2 RAD Modem Wiring and Grounding FIGURE 4 2 shows a typical setup of the RAD modems Installation is as follows 1 Set the DCE DTE switch on the back of the RAD modem connected t...

Страница 15: ...includes hardware for mounting to ground lug of Campbell Scientific enclosures models ENC10 12 ENC12 14 or ENC16 18 Spark gap wiring is straight through such that pin to pin continuity exists between...

Страница 16: ...nductor cables to the modem at the computer end and disconnect the cable from the modem at the datalogger end Twist together the XMT wire and RCV wire twist together the XMT wire and the RCV wire Repe...

Страница 17: ......

Страница 18: ...ua Apinag s nbr 2018 Perdizes CEP 01258 00 S o Paulo SP BRASIL www campbellsci com br vendas campbellsci com br Campbell Scientific Canada Corp 14532 131 Avenue NW Edmonton AB T5L 4X4 CANADA www campb...

Отзывы: