FT-131 Cascade Fountain
Three people are recommended for the installation of this fountain!
Revised June 2, 2017
Assemble your fountain on a level surface capable of holding a minimum of 586 pounds with an approximate 1.5 square foot footprint.
FT-131F (50 lbs)
18”W x 4.5”H
P-502 (198 lbs)
39.5”W x 9.75”H
FT-131C (25 lbs)
11.5”W x 7”H
FT-131B (113 lbs)
29.25”W x 8”H
FT-131A (28 lbs)
18”W x 4.5”H
FT-131D (2 lbs)
5”L x 1.5”W x 4.75”H
1.
Place the base (FT-131F) into position where the fountain will be installed, ensuring
that it is level.
2.
Center the Zen Bowl (P-502) over the base (FT-131F)
3.
Assemble the pump kit
a.
Attach the 1/2” non-kink tubing to the pump outlet.
b.
Place the stopper around the pump cord approximately 8” from the pump.
4.
Feed the pump cord through the hole in the Zen Bowl (P-502) and the channel in the
base (FT-131F).
5.
FIRMLY
press the stopper into the hole evenly.
a.
Note: Using the handle of a screwdriver or hammer works best to press the
stopper in place.
6.
Place the pump house (FT-131C) over the pump and in the center of the Zen Bowl
(P-502).
7.
Feed the tubing that is connected to the pump through the center of the middle bowl
(FT-131B).
8.
Center the middle bowl (FT-131B) over the pump house (FT-131C).
9.
Insert the CPVC pipe connected to the tubing into the PVC coupling in the bottom
of the top bowl (FT-131A).
10.
Center the top bowl (FT-131A) over the middle bowl (FT-131B).
11.
Fit the pump house door (FT-131D) into the pump house (FT-131C).
12.
Fill the fountain with water.