background image

FT-271 Fonthill Fountain 

Assembly Instructions

Professional installation is recommended for this fountain!

Assemble your fountain on a level surface capable of holding a minimum of 1,510 lbs with an  
approximate 4 sq. ft. footprint (actual dimensions 24" x 24").

Step 1 -   Place the base (FT-271H) on a level surface where the fountain will be asembled.

 

1a -  Be sure to check that each part is level and centered during the assembly of  

this fountain. 

FT-271H (392 lbs) 

24"L x 24"W x 15"H

Fountain Set-Up:

 

Assembly & Installation - A fountain can be difficult to install without knowing and understanding the steps involved. To ensure your fountain is  
installed properly, please read our instructions and tips before you begin.
 

Step 1 -   Seek Professional Help: Check if professional installation is recommended for your fountain.

 

Step 2 -   Check Foundation: Place your fountain on a level surface. It is recommended to place your fountain on concrete or a hard packed  

gravel pad. If the base is level but some components seem off, rotate components or use wedges to level them.

 

Step 3 -   Create a Drip Loop: To prevent water from dripping down the cord and damaging the electrical socket, create a drip loop by allowing  

the pump power cord to fall below the wall outlet.

 

Step 4 -   Use a GFCI Outlet: Use only a GFCI outlet when running a fountain.

Step 7 -   Place the large pedestal (FT-271F) over the pump.

Step 8 -  Feed the tubing that is connected to the pump through the hole in the center of the large 

pedestal (FT-271F).

Step 2 -   Place the urn (P-712) over the base.

Step 3 - Assemble the pump kit:

 

3a - Fit the 3/4" clear end of the 24" tubing assembly over the pump outlet.

 

3b - Place the stopper around the pump cord approximately 8" from the pump.

Step 4 -  Feed the pump cord all the way through the hole in the urn (P-712), through the base  

(FT-271H), and out of the opening in the bottom of the base.

Step 5 - FIRMLY press the stopper into the hole evenly.

 

5a -  Note: Using the handle of a screwdriver or hammer works best to press the stopper in place.

Step 6 - Insert one #7 drain plug into the urn.

P-712 (535 lbs) 

47"W x 26"H

P-271F (101 lbs) 

13.5"W x 18"H

Step 9 -   Position the medium bowl (FT-271E) over the large pedestal (FT-271F).

Step 10 -  Using a hose clamp, secure the tubing that was fed through the large pedestal (FT-271F) 

to the pipe protruding from the bottom of the medium bowl (FT-271E).

Step 11 -  Secure the 18" length of tubing to the pipe protruding from inside the medium bowl  

(FT-271E) with a hose clamp.

Step 12 -  Insert the remaining #7 drain stopper into the medium bowl.

P-271E (94 lbs) 

29"W x 9.5"H

Отзывы: