FT-206 Austin Fountain
Assembly Instructions
FT-206A (97 lbs)
29.5"L x 18.5"W x 10.25"H
UNDER THE BOWL (FT-206A)
Step 7 - Position the bowl (FT-206A) over the large pedestal (FT-206B).
Step 8 - Insert the CPVC end of the tubing assembly into the pipe protruding from the bottom of
the bowl (FT-206A).
Step 9 - Feed the remaining tubing through the hole in the pedestal (FT-206B).
Step 10 - Pull the tubing and pump out of the pump house (FT-206C).
Step 11 - Connect the non-kink tubing to the pump water outlet with a hose clamp.
Step 12 - Push the pump and tubing back into the pump house (FT-206C).
INSIDE THE BOWL (FT-206A)
Step 13 - Fit the 5½" copper pipe into the CPVC coupling protruding from the bottom of the bowl.
Step 14 - Use the silicone provided to attach the copper spillers.
14a - Clean away any excess silicone.
Step 15 - Fit the pump house door (FT-206D) into the pump house (FT-206C).
Step 16 - Let the fountain sit 24 hours before fi lling with water.
FT-206D (4 lbs)
5.75"L x 1.75"W x 4.75"H