10
Mounted supporting pole
Pegging
Note! All zips must be closed. Using the
plastic pegs, start the pegging as per dia-
gram, then peg in a straight line from corner
to corner. Only peg the mud flaps down in
poor weather using the steel wire pegs.
After pegging mount the supporting poles
in each corner. They must be placed in the
corner by peg no 5 & 6. In stormy weather
you must use the guy lines provided.