using Qty (1) M6 nut. Thread second nut onto bolt leaving
approximately 1.5” to the top of the cap. Thread cap
assembly down into the chimney bracket until the lower
nut hits the bracket. See Fig 3.
M8 X 60 BOLT
M8 FLANGE NUT
M6 X 15 SCREW
CHIMNEY GASKET
M6 NUT
M6 X 76 BOLT
FIG. 3
4. The height of the chimney cap can be adjusted for
summer and winter. In the summer the gap should be
approximately 1-1/2”. In the winter the gap should be
approximately ½”.
5. Tighten all hardware.
INSTALL HANDLE
1. Install the handle as shown in Fig 4.
2. Tighten all hardware.
M6 HANDLE SCREW (2)
HANDLE DEFLECTOR
HANDLE
HANDLE BEZEL (2)
M6 X 15 SCREW
GREASE BUCKET
ASH CUP
FIG. 4
INSTALL HOPPER HANDLE
1. Install hopper handle as shown in Fig. 5.
FIG. 5
ASSEMBLY INSTRUCTIONS
Remove all loose parts from the inside of the grill and
hopper. Lay a blanket or piece of cardboard down to protect
the grill.
ATTACH THE LEGS
With the help of another person flip the grill upside down
on the blanket or cardboard. The grill lid and hopper lid will
swing open when doing this so be careful not to damage
the lids. The grill may also want to roll on its lid so one
person should hold the grill steady while the other person
assembles the bottom legs and wheels.
1. Lay the grill on its back.
2. Install each of the 4 legs as shown in Fig 1. Make sure
the legs with wheels are attached to the right side of
the grill with the wheels facing out. Note: Front legs are
marked with an F and back legs are marked with a B.
3. Stand the grill upright
4. Tighten all hardware.
FIG. 1
M8 X 20 BOLT
M8 LOCK WASHER
ATTACH BOTTOM SHELF
1. Install bottom shelf as shown in Fig. 2 by installing
hardware in each of the 4 corners.
2. Tighten hardware.
FIG. 2
M8 X 60 BOLT
M8 FLANGE NUT
M6 X 15 SCREW
CHIMNEY GASKET
M6 NUT
M6 X 76 BOLT
ATTACH CHIMNEY AND CHIMNEY CAP
1. Install chimney to grill as shown in Fig 3. Make sure to
install the gasket between the grill and the chimney.
2. Tighten all hardware.
3. Install M6 x 76 Bolt through chimney cap and secure