Install & Operating Manual
CamSafe
Air Inlet Installation
Prepare installation of the tower / the bottom collector using the installation dimensions & footprint
information in the project drawing.
After placing at least the inlet collector, and fixing it to the ground, the inlet funnel may be sealed into
the dry wall.
If a finishing frame (optional) with inlet grid is to be installed, sealing may be applied in the gap
between the funnel and cutout or, alternatively, under the flange of the finishing frame.
The finishing frame is fixed using 4 screws.
With a finishing frame, grid installation and -operation is tool-less.
Ca.
+10
mm