background image

 

      

                                               

      

TOV

 

 

 
 

Installation, Operation and Maintenance Manual 

 

 

 

 

WKM-TOV-IOM 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Procedure 

 

The  following  procedure  applies  to  new  installation 

between standard ASME B16.5 pipe flanges. 

When  replacing  a  valve  from  an  existing  installation, 

The  flange  faces  shall  be  cleaned  of  any  residual 

gasket material before starting. 

 
Actuation  shall  not  be  removed  from  the  valve  for 

installations  unless  the  actuator  must  be  transferred 

during replacement. 

 
1.  Protective  covers  shall  be  removed  from  the  valve. 

Be sure valve is completely closed. 

 
2.  Lug  body  valves  shall  be  positioned  between  the 

flanges with gaskets properly centered and then the 

bolting inserted (Figure 4). 

 
3. Disc clearance shall be carefully checked by placing 

the  valve  in  the  full  open  position.  Should  automated 

valves be difficult or impossible to cycle, check that the 

raised  face  of  the  flange  matches  the  raised  area  on 

the valve face. 

 
4. All  bolting  shall  be  tightened   in a crossover or star 

pattern to insure even sealing  (Figure 4), refer figure 9 

for star pattern tightening method 

 
5.  Packing  retainer  tightness  is  pre-tested  at  the 

factory.  Should  shaft  leakage  occur  at  start-up,  the 

packing retainer can be adjusted to stop the leak. 

 
Avoid  over  tightening  which  may  result  in  excessive 

operating torque or premature packing wear.

 

Worm gear operated 

 

Worm 

gear 

operators, 

available 

as 

standard 

equipment on all valves, which are not power actuated, 

have an arrow on top of the operator that indicates the 

"OPEN - CLOSED" position of the disc (Figure 5) 

Counter-clockwise  rotation  of  the  hand  wheel  opens 

the valve, clockwise rotation closes the valve. 

Raised Face Area 

Lug Body 

Figure 5: Gearbox 

Figure3: Flange detail 

Figure 4: Lug body 

 

Close stop 

adjustment 

Open stop 

adjustment 

Содержание WKM

Страница 1: ...TOV Installation Operation and Maintenance Manual 1 WKM TOV IOM Installation Operation and Maintenance Manual 3 24 150 300 600 CLASS WKM TRIPLE OFFSET VALVE WKM ...

Страница 2: ...leshooting guide 13 Packing maintenance 14 Sealing elements maintenance 15 Bottom cap gasket maintenance 17 Mounting Operators 18 Torque charts 19 Cameron s Valves Measurement Segment Released 07 2018 WKM TOV IOM Notes This manual is a general representation of the information required for correct usage of the CAMERON WKM TOV valve More specific information is available and can be supplied per cus...

Страница 3: ...TOV Installation Operation and Maintenance Manual 3 WKM TOV IOM List of components ...

Страница 4: ...figuration details of WKM Triple Offset Valves such as valve type pressure class end connections body bonnet and trim materials and special features Nameplate information 1 Valve size 2 Valve class 3 Seal material See for reference nameplate drawing below 4 Body material 5 Disc material 6 Shaft material 7 Flange type 8 Figure number 9 Serial number 10 Maximum CWP ...

Страница 5: ...er assembly and test WKM Triple Offset Valves are placed in the closed position Carbon steel valves are painted on the external surfaces Flange protection is provided for all valves Valves should be stored in a clean dry location Outdoor storage is permissible but should be off the ground and protected from the elements For long term storage contact your Cameron representative Installation Althoug...

Страница 6: ...g edge on the pipe I D and damaging the sealing surface Chamfer is recommended on the pipe flange Minimum pipe I D required for disc swing clearance Class 150 valves Standard pipe or equivalent Class 300 valves Schedule40 XS pipe or equivalent Class 600 valves Schedule 100 pipe or equivalent Consult Table 1 Disc clearance for required flange modifications for other pipe schedules Figure 2 Table 1 ...

Страница 7: ...NO PROTRUSION NO PROTRUSION NO PROTRUSION 600 23 38 0 NO PROTRUSION NO PROTRUSION 8 150 69 47 20 10 NO PROTRUSION NO PROTRUSION 300 63 44 20 10 NO PROTRUSION NO PROTRUSION 600 46 5 34 5 NO PROTRUSION NO PROTRUSION 10 150 91 72 39 31 NO PROTRUSION NO PROTRUSION 300 85 66 39 31 NO PROTRUSION NO PROTRUSION 600 61 5 51 5 NO PROTRUSION NO PROTRUSION 12 150 107 86 53 44 NO PROTRUSION NO PROTRUSION 300 1...

Страница 8: ...alves be difficult or impossible to cycle check that the raised face of the flange matches the raised area on the valve face 4 All bolting shall be tightened in a crossover or star pattern to insure even sealing Figure 4 refer figure 9 for star pattern tightening method 5 Packing retainer tightness is pre tested at the factory Should shaft leakage occur at start up the packing retainer can be adju...

Страница 9: ...6 3 04 2 17 300 10 63 3 4 10 UNC 24 3 56 2 68 600 11 50 1 000 8 UNC 20 4 98 3 85 4 4 10 3 23 8 150 11 75 3 4 10 UNC 16 3 32 2 45 300 13 00 7 8 9 UNC 24 3 83 2 83 600 13 75 1 1 8 8 UN 20 5 89 4 64 4 4 91 3 65 10 150 14 25 7 8 9 UNC 24 3 67 2 67 300 15 25 1 000 8 UNC 24 4 41 3 28 8 3 91 2 78 600 17 00 1 1 4 8 UN 24 6 44 5 07 8 5 38 4 01 12 150 17 00 7 8 9 UNC 24 3 73 2 73 300 17 75 1 1 8 8 UN 28 4 8...

Страница 10: ...1 2 8 UN 32 7 54 5 92 8 6 32 4 70 18 150 22 75 1 1 8 8 UN 28 4 77 3 51 4 3 83 2 57 300 24 75 1 1 4 8 UN 40 5 86 4 49 8 4 83 3 46 600 25 75 1 5 8 8 UN 32 8 24 6 49 8 6 78 5 03 20 150 25 00 1 1 8 8 UN 32 5 02 3 68 8 3 95 2 62 300 27 00 1 1 4 8 UN 40 6 06 4 61 8 5 04 3 59 600 28 50 1 5 8 8 UN 40 8 56 6 74 8 7 19 5 36 24 150 29 50 1 1 4 8 UN 32 5 32 3 87 8 4 41 2 96 300 32 00 1 1 2 8 UN 40 6 92 5 22 8...

Страница 11: ...8 150 11 75 3 4 10 UNC 8 3 17 2 29 300 13 7 8 9 UN 8 3 83 2 83 600 13 75 1 1 8 8 UNC 8 5 70 4 44 10 150 14 25 7 8 9 UNC 8 3 44 2 43 300 15 25 1 8 UNC 8 4 41 3 28 600 17 1 1 4 8 UN 8 6 44 5 07 12 150 17 7 8 9 UNC 8 3 50 2 50 300 17 75 1 1 8 8 UN 8 4 86 3 60 600 19 25 1 1 4 8 UN 8 6 44 5 07 14 150 18 75 1 8 UNC 8 4 22 3 09 300 20 25 1 1 8 8 UN 8 5 18 3 92 600 20 75 1 3 8 8 UN 16 6 97 5 48 Table 3 IS...

Страница 12: ... 300 24 75 1 1 4 8 UN 8 5 54 4 17 600 25 75 1 5 8 8 UN 16 7 84 6 09 20 150 25 1 1 8 8 UN 8 5 02 3 68 300 27 1 1 4 8 UN 8 5 75 4 30 600 28 5 1 5 8 8 UN 16 8 05 6 22 24 150 29 5 1 1 4 8 UN 8 5 12 3 67 300 32 1 1 2 8 UN 8 6 64 4 94 600 33 1 7 8 8 UN 16 9 12 7 04 Valve position verification 1 Check the operation of the valve by stroking it to full open and full close To verify the valve orientation th...

Страница 13: ...o wipe clean or disassemble valve and clean disc edge 4 Shaft key has sheared 4 Determine cause of shearing and correctly replace shaft key 5 Fluid solidification between bearings and shaft 5 Flush bearings Jerky operation 1 Packing is too tight 1 Loosen packing nuts cycle valve retighten 2 Air supply inadequate for the actuator 2 Increase air supply pressure and or volume 3 Actuator shaft adapter...

Страница 14: ... 7 Packing cavity shall be cleaned with Light Mineral Oil and shaft with Molykote P74 Grease or Equivalent 8 Packing washer 12 new packings 13 packing bushing 14 blow out ring 15 and packing retainer 16 shall be reassembled according to the assembly configuration noted in point 3 9 Packing retainer nuts 18 shall be assembled by hand without torque tightening equipment after applying a thin film of...

Страница 15: ...losed position along with shaft Figure 8 a If needed the packing nuts shall be loosened for frictionless rotation 5 The seal retainer screws 29 shall be removed and the seal retainer shall be carefully removed 28 6 The seal ring assembly 27 and the graphite gasket 26 shall be removed 7 The body seat shall be inspected and cleaned with a fine abrasive cloth No 600 or finer if necessary 8 The disc s...

Страница 16: ... sockethead cap screw 75 of required bolt torque Use star pattern torque sockethead cap screw 100 of required bolt torque Use circular pattern repeat 100 bolt torque to equalize load A Gear box Close stop adjustment Using gear box back out close stop adjustment 5 turns Apply handwheel torque to close valve completely Turn stop in until contact and lock the Position with jam nut as shown in the fig...

Страница 17: ...ed 4 A thin film of lubricant Light Mineral Oil shall be applied on the new spiral wound gasket 9 5 The spiral wound gasket shall then be inserted on the bottom cap 10 it shall also be centered and positioned on the body bore 6 The bottom cap shall be rotated to be accommodated to the correct position and the holes shall be centered with the threaded holes on the body 7 A thin film of lubricant by...

Страница 18: ...ing bracket and the flatness of each of these surfaces shall be maintained to close tolerances A maximum deviation of 0 2mm is recommended for Parallelism as well as for Flatness independently 5 Mounting bracket bolt holes of the top and the bottom surfaces shall be aligned precisely with each other as well as with the corresponding bolt holes of the actuator and the valve 6 Adapters for the valve...

Страница 19: ...ACKING NUTS SIZE CLASS BOLT SIZE TORQUES FT LB N M 3 150 M10 11 15 3 300 M10 15 20 4 150 M10 15 20 4 300 M10 15 20 4 600 M12 21 29 6 150 M12 22 30 6 300 M12 26 35 6 600 M16 52 70 8 150 M12 22 30 8 300 M14 33 45 8 600 M16 41 55 10 150 M14 33 45 10 300 M16 44 60 10 600 M16 48 65 12 150 M16 44 60 12 300 M16 52 70 12 600 M16 52 70 14 150 M18 74 100 14 300 M20 103 140 14 600 M20 95 129 16 150 M18 81 11...

Страница 20: ...nstallation Operation and Maintenance Manual 20 WKM TOV IOM For the most current contact and location information go to www products slb com Cameron s Valves Measurement Segment Released 09 2018 WKM TOV IOM ...

Отзывы: